Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ABSTRACT <br /> <br />If it is determined in a later study that more storage in addition to what <br />is beinq provided by the roadway embankments is necessary, upstream storage <br />facilities will need to be studied. This, however, is beyond the scope of <br />this report, since this report is designed to study the maximum limits to <br />be encountered in the 100-year fl ood pI ai n after development occurs in <br />Marcy Gulch. <br /> <br />This report was prepared for the Urban Drainaqe and Flood Control District, <br />Colorado Water Conservation Board, Douglas County, and Mission Viejo <br />Company, and describes that portion of the Marcy Gulch drainage basin that <br />would be inundated by a flood with a return frequency of 100 years. Fully <br />developed site conditions were assumed, but without any mitigating features <br />which would maintain flood discharges at pre-development levels. The <br />flooding I imits described in this report, therefore, represent the worst <br />possible 100-year flooding conditions after the site is developed. <br /> <br />I. INTRODUCTION <br /> <br />A. SCOPE OF WORK <br /> <br />For the most part, Marcy Gulch has a well defined natural channel and, <br />with a few exceptions, the 100-year flood is contained within its existing <br />banks. Existing U.S. Highway 85 and both the AT&SF and D&RGW railroads <br />will not be overtopped where they cross the Gulch. The underside of the <br />Highline Canal structure which crosses the Gulch will be inundated ap- <br />proximately 1.0 feet and may be subject to flood damage if no mitigating <br />measures were imp I emented. Mit i gat i ng measures wi 11 be addressed in the <br />Master Plan of Drainage yet to be developed. <br /> <br />This study was prepared for the New Town of Highlands Ranch to determine <br />the infrastructure facilities required in Marcy Gulch to support initial <br />development, and to develop drainage and erosion control concepts for the <br />proposed development. <br /> <br />Maximum 100-year flood backwater conditions were also evaluated at the <br />sites of proposed road crossings along the various reaches of Marcy Gulch. <br />These crossings include the access road to Marcy Gulch Treatment Plant, <br />Rangeline Road, North Highlands Ranch Parkway, South Highlands Ranch <br />Parkway, and McLellan Drive. The predicted maximum flooding limits for <br />conditions before and after the construction of these future road crossings <br />are shown on the Flood Hazard Area Del ineation drawings included in the <br />Appendix of this report. These road crossings mayor may not be used to <br />retard flow and reduce peak discharges; therefore, the maximum water <br />surface elevations shown on the drawings are based upon anticipated roadway <br />elevations and not upon a storage or discharge requirement. This maximum <br />backwater limit will be used as the control elevation for determining <br />available storage at the roadway crossings and/or an elevation to guide in <br />the location of development upstream of the roadway crossings. The design <br />of outlet control facilities in the roadway embankment will be such that <br />the max imum backwater e I ev at i on never be exceeded duri ng the IOO-year <br />storm. <br /> <br />This report describes that portion of the Marcy Gulch Drainage Basin that <br />would be inundated by a flood with a return frequency of 100 years after <br />the drainage basin is fully developed in accordance with the Development <br />Plan for the New Town of Highlands Ranch. The IOO-year flood flows con- <br />sidered in this report are to be taken as maximum values and do not reflect <br />expected peak flow reductions that would result from the construction of <br />retarding basins and other mitigating measures which will be employed <br />during and after development of the area. In order to determine the <br />flooding I imits for such a flow, it was necessary to eval uate the site <br />hydrologic conditions and, through the various methods described later in <br />this report, peak flood flow rates were calculated at key locations in the <br />drainage basin. Hydraulic calculations were then performed to determine <br />the water surface profile and flooding limits corresponding to these flow <br />rates. Also, floodway limits were evaluated and backwater flood plain <br />limits and profiles were determined for tentative culvert/embankment type <br />of road cross i ngs. <br /> <br />B. COORDINATION <br /> <br />Appropriate methodologies for performing the necessary analyses were <br />established through consultations with the Urban Drainage and Flood Control <br />District. <br />