Laserfiche WebLink
<br /> <br />Subsequent to elevating <br />the structure, the struc- <br />tural engineer for the <br />project decided to add <br />a perimeter beam of re- <br />inforced concrete <br />between the floor slab <br />and the concrete block <br />piers. This will require <br />raising the structure a <br />few additional inches to <br />allow installation of <br />exterior doors. <br /> <br /> <br />~. <br /> <br /> <br />Jilt <br /> <br />y <br />! <br /> <br />j <br /> <br /> <br />While the new foundation is being <br />constructed, the structure is sup- <br />ported on cribbing placed beneath <br />the steel framework on which it <br />was lifted and moved. <br /> <br />22 <br />