My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07623
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07623
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:18 PM
Creation date
10/5/2006 3:06:42 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
497
County
Douglas
Community
Parker
Basin
South Platte
Title
FIS - Parker
Date
7/1/1989
Designation Date
1/1/2000
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />and increases flood hazards in areas beyond the encroachment <br />itself. One aspect of floodplain management involves balancing the <br />economic gain from floodplain developmen't against the resul t ing <br />increase in flood hazard. For purposes of the NFIP, a floodway is <br />used as a tool to assist local communities in this aspect of <br />floodplain management. Under this concept, the area of the 100- <br />year floodplain is divided into a floodway and a floodway fringe. <br />The floodo/ay is the channel of a stream, plus any adjacent <br />floodplain areas, that must be kept free of encroachment so that <br />the lOa-year flood can be carried without substantial increases in <br />flood heights. Minimum Federal standards limit such increases to <br />1.0 foot, provided that hazardous velocities are not produced. The <br />floodways in this study are presented to local agencies as minimum <br />standards that can be adopted directly or that can be used as a <br />basis for additional floodway studies. <br /> <br />The floodways presented in this study were computed for certain <br />stream segments on the basi.s of equal conveyance reduction from <br />each side of the floodplain. Floodway widths were computed at cross <br />sections. Between cross sections, the floodway boundaries were <br />interpolated. The results of the floodway computations are <br />tabulated at selected cross sections (Table 2). In cases where the <br />floodway and lOa-year floodplain boundaries are either close <br />together or collinear, only the floodway boundary has been shown. <br /> <br />The area between the floodway and lOa-year floodplain boundaries is <br />termed the floodway fringe. The floodway fringe encompasses the <br />portion of the floodplain that could be completely obstructed <br />without increasing the water-surface elevation of the lOa-year <br />flood more than 1.0 foot at any point. Typical relationships <br />between the floodway and the floodway fringe and their significance <br />to floodplain development are shown in Figure 2. <br /> <br />I~ <br /> <br />100. YEAR FLOODPLAIN <br /> <br />.1 <br /> <br />.. <br /> <br />FLOODWAY <br />FRINGE <br /> <br />. <br /> <br />FLOODWAY <br /> <br />FLOODWAY <br />FRINGE <br /> <br />STREAM _ <br />CHANNEL <br /> <br />FLOOD ELEVA nON WHEN <br />CONFINED WITHIN FLOODWAY <br /> <br /> <br />ENCROACHMENT <br /> <br /> <br /> <br />FLOOD ELEVATION BEFORE <br />ENCROACHMENT ON FLOODPLAIN <br /> <br />C <br /> <br />,. ............... .................. <br />. .~:.:.::.::::::.::.:::.::::.:::::::.:.::::.. -- <br />~.~..':":"'.~..~.~..~.~..~:. - - - <br />.................. ........... <br />................ .......... <br />........... ........... <br /> <br />AREA OF FLOODPLAIN THAT COULD BE USED <br />FOR DEVELOPMENT BY RAISING GROUND <br /> <br />LINE AB IS THE FLOOD ELEVATION BEFORE ENCROACHMENT. <br />LINE CD IS THE FLOOD ELEVATION AFTER ENCROACHMENT. <br />.SURCHARGE IS NOT TO EXCEED 1.0 FOOT (FIA REOUIREMENT) OR LESSER AMOUNT IF SPECIFIED BY STATE. <br /> <br />Figure 2. Floodway Schematic <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.