Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.~..., <br /> <br />CHANGES ARE MADE IN DETERMINATIONS OF BASE FLOOD ELEVATIONS FOR THE CITY OF <br />LOUISVIllE AND THE UNINCORPORATED AREAS OF BOULDER COUNTY, COLORADO, UNDER <br />THE NATIONAL FLOOD INSURANCE PROGRAM <br /> <br />On May 6,1996, and June 2, 1995,1he Federal Emergency Management Agency (PEMA) identified <br />Special Flood Hazard Areas (SFHAs) in 1he City of Louisville and 1he unincorporated areas of Boulder <br />County, Colorado, through issuance of a Flood Insurance Rate Map (FIRM) for Boulder County, Colorado <br />and Incorporated Areas. <br />The Mitigation Directorate has determined 1hat modification of 1he elevations of 1he flood having a <br />I-percent chance of being equaled or exceeded in any given year (base flood) for certain locations in 1he City <br />of Louisville and Boulder County is appropriate, The modified base flood elevations (BPEs) revise 1he FEMA <br />FIRM for 1he community. <br />The changes are being made pursuant to Section 206 of 1he Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and are in accordance wi1h 1he National Flood Insurance Act of 1968, as amended (Title <br />XIII of 1he Housing and Urban Development Act of 1968, Public Law 90-448), 42 U,S.C. 4001-4128, and <br />44 CFR Part 65, <br />A hydraulic analysis was performed to incorporate modifications to 1he Burlington Northern Railroad <br />bridge along Coal Creek and has resulted in a reduction in SFHA and modified BPEs from approximately <br />1,550 feet downstream of Empire Road to approximately 3,700 feet upstream of South 961h Street, The table <br />below indicates 1he modified BPEs for several locations along 1he affected length of Coal Creek, <br /> <br />Location <br /> <br />Existing BPE <br />(feet)* <br /> <br />Modified BPE <br />(feet)* <br /> <br />Approximately 1,550 feet downstream of Empire Road <br />Approximately 150 feet upstream of Empire Road <br />At 1he Burlington Northern Railroad <br />Approximately 3,700 feet upstream of Sou1h 961h Street <br /> <br />5,279 <br />5,300 <br />5,330 <br />5,359 <br /> <br />5,279 <br />5,302 <br />5,321 <br />5,359 <br /> <br />*National Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under 1he above-mentioned Acts of 1968 and 1973, 1he Mitigation Directorate must develop criteria <br />for floodplain management. For 1he community to participate in 1he National Flood Insurance Program <br />(NF1P), 1he community must use 1he modified BPEs to administer 1he floodplain management measures of 1he <br />NFIP. These modified'BPEs will also be used to calculate 1he appropriate flood insurance premium rates for <br />new buildings and their contents and for the second layer of insurance on existing buildings and contents. <br />Upon 1he second publication of notice of these changes in this newspaper, any person has 90 days in <br />which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br />Directorate reconsider the determination. Any request for reconsideration must be based on knowledge of <br />changed conditions or new scientific or tecbnical data. All interested parties are on notice that until the 90-day <br />period elapses, the Mitigation Directorate's determination to modify the BPEs may itself be changed <br />