Laserfiche WebLink
<br />Building Flood Proofed by Raising on Fill <br /> <br />Figure 4 Elevation: Raised on Fill <br /> <br /> <br />Figure 5 Sect,on: Ra,sed on Fill <br /> <br />J~~ <br /> <br />U I:c <br /> <br />I~j <br />L~ <br /> <br />~ <br />~ <br /> <br />-~y~ <br />~ <br />"'"''--< "{Ji', ,{; <br />,;1 -: , <br /> <br />~, <br /> <br />'~~~~'?:'0007 <br /> <br />1:)0 / <br />. <br />I <br />,-::...1 <br /> <br /> <br />Essentially the same building design as basic building <br />except that the structure is raised 7 feet (1 foot above the <br />base flood level) on compacted fill. The fill is sloped on <br />the north and east with an 8,33% cUlVing pedestrian <br />ramp, A parking area is located on the east. <br /> <br />15 <br />