My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07526
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07526
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:01 PM
Creation date
10/5/2006 3:02:29 AM
Metadata
Fields
Template:
Floodplain Documents
County
Broomfield
Community
Broomfield
Stream Name
Westlake Channel
Basin
South Platte
Title
LOMR - Affected Panel 085073 0220, 085073 0220 D - Case No. 96-08-056P
Date
5/16/1996
Prepared For
Broomfield
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />Public notification of the revised BFEs will be given in the Broomfield Entewrise on or about June 20 <br />and June 27, 1996. A copy of this notification is enclosed. Any request for reconsideration must be <br />based on scientific or technical data. In addition, a notice of changes will be published in the Federal <br />Register. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your community will serve as a repository for these new data. We encourage you <br />to disseminate the information reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />information. We also encourage you to prepare a related article for publication in your community's local <br />newspaper. This article should describe the assistance that officials of your community will give to <br />interested persons by providing these data and interpreting the NFlP maps. <br /> <br />The revisions are effective as of the date of this letter; however, within 90 days of the second publication <br />in the Broomfield Entewrise, a citizen may request that FEMA reconsider the determination made by this <br />LOMR, Any request for reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the determination to modify the BFEs presented <br />in this LOMR may itself be modified. <br /> <br />In a letter dated February 26, 1996, to Mr. Doherty, we responded to a request from your community <br />that we initiate a physical map revision to reflect the effects of LOMRs issued since the FIRM was last <br />published. We stated that we would initiate a physical map revision if your community is willing to share <br />the cartographic costs of republishing the FIRM. Mr. Behlen has indicated that your community is <br />interested in sharing the costs of republishing the FIRM. We will send your community an invoice for <br />the cartographic costs within 30 days of the date of this letter. <br /> <br />The physical map revision will modify FIRM Panels 0215 C and 0220 D and the FIS report. The revised <br />FIRM panels will present information from the effective FIRM and FBFM panels as well as information <br />presented in LOMRs issued since the effective date of the FIRM, including the modifications described <br />in this LOMR. Before publishing the revised panels and FlS report, we will issue preliminary copies for <br />review by your community. To ensure that we provide your community with the most up-to-date <br />information possible, we request that your community review the effective FIRM and FBFM panels <br />referenced above and the effective FIS report to determine if any additional changes are warranted. <br />Examples of possible changes include updates to corporate limits, new streets within or adjacent to <br />designated SFHAs, and revised floodway boundary delineations. <br /> <br />To assist us in processing the revised FIRM and FIS report in a timely manner, we request that your <br />community submit changes within 30 days of the date of this letter. We will review all information <br />received during this 30-day period and incorporate it as appropriate into the preliminary copies of the <br />revised FIRM and FlS report, which are scheduled to be delivered for review in 4 months. <br /> <br />The floodway is provided to your community as a tool to regulate floodplain development. Therefore, <br />the floodway modifications described in this letter, while acceptable to FEMA, must also be acceptable <br />to your community and adopted by appropriate community action, as specified in Paragraph 60.3(d) of <br />the NFlP regulations, <br />
The URL can be used to link to this page
Your browser does not support the video tag.