Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Waterline <br />Relocation <br /> <br />Erosion <br />Control <br />Criteria <br />Manual <br /> <br />404 <br />Permitting <br /> <br />Master <br />Drainage <br />Planning <br />Study, 2nd <br />and 3rd <br />Creek <br />Basins <br /> <br />Westminster <br />Parks and <br />Recreation <br /> <br />Douglas <br />County Road <br />75 Bridge <br />Replacement <br />Project <br /> <br />Westminster <br />City Hall <br />Civil <br />Engineering <br /> <br />Highway bridge <br />widening project, <br />involving a 24-irich <br />waterline, construction <br />observation. <br /> <br />Preparation and <br />presentation of <br />erosion control <br />criteria for <br />development plan <br />review. <br /> <br />Various 404 permit- <br />ting submittals <br />prepared for various <br />public and private <br />concerns including <br />the Town of <br />Telluride, Zupan <br />Enterprises (Pueblo, <br />Colorado), South <br />Creek Channel <br />Improvements and <br />Sinton Road Bridge <br />Improvements in <br />Colorado Springs, <br />Colorado, et.al. <br /> <br />Hydrologic and <br />hydraulic planning <br />and predesign for <br />104 square mile <br />drainage area <br />encompassing the <br />New Denver Regional <br />Airport. <br /> <br />Rick Mark <br />303-430-2400 <br /> <br />Thomas C. Fairley <br />Richard N. Wray <br /> <br />Arapahoe <br />County <br />Bill <br />Rothenmeyer <br />303-795-4640 <br /> <br />Richard N. Wray <br />Thomas C.Fairley <br /> <br />varies <br /> <br />Richard N. Wray <br />James Y. Chang <br />Thomas C. Fairley <br /> <br />Urb,an <br />Drainage <br />and Flood <br />Control <br />District <br />Ben Urbonas <br />303-455-6277 <br /> <br />Civil engineering Thomas <br />design for the Bellio/ <br />Waterpointe detention <br />pond. <br /> <br />Design of bridge <br />and roadway improve- <br />ments for existing <br />county road over <br />Horse Creek <br /> <br />C. Fairley City of <br />Westminster <br />Dave Loseman <br />Project Manager <br />303-430-2400 <br /> <br />Richard N. Wray <br />William H. Yau <br /> <br />Douglas <br />County <br />Engineering <br />Randy Teague <br />303-660-7490 <br /> <br />Civil engineering Thomas C. <br />design for Westminster <br />City Hall, including <br />grading, drainage, <br /> <br />Fairley City of <br />Westminster <br />Bob Lieneman <br />Project Manager <br />