My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07521
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07521
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:12:00 PM
Creation date
10/5/2006 3:02:24 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Stream Name
All
Basin
Statewide
Title
The Principles of Flood Control
Date
3/22/1945
Prepared For
State of Colorado
Prepared By
C.N. Phillips
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />17 <br /> <br />3. The actual cost of steam-electric power from a <br />plant recently put in service in the same serv- <br />ice area. <br /> <br />If enterprises such as these used realistic formulae for the <br />value of electric power, they would fail of justification as multi- <br />purpose projects on the basis of the economics being employed ~ the <br />Army Engineers, and the way would then be cleared for projects for the <br />primary purpose of protection of lives and property from floods. <br /> <br />This paper shoulc. not be closed without some mention of TVA <br />which is the leading example of the application of the multi-purpose <br />idea. Claims of considerable magnitude as to the benefits obtained and <br />the wonders accomplished have appeared in print from time to time, but <br />evidently these have come from the publicity department, and not from <br />the engineers responsible for the complex operations which seem to be <br />anticipated. From time to time tile engineers have issued general state- <br />ments as to the method of operation and of the design of structures but <br />apparently the TVA engineering staff has not yet issued any quantitative <br />analysis of what will happen on the Tennessee River when a big flood <br />happens. Until such an analysis is available, judgment as to the <br />technical proficieney of the plan should be withheld. But in the mean- <br />time, some of the end results are plainly visible, and it is pertinent <br />to examine them. <br /> <br />First, it is well to look at the map of the Tennessee Valley, <br />sho....n on Chart XV. While some of the projects are on the headwaters in <br />suitable locations for flood protection, the major structures are on <br />the main stem of the river, and cannot be of any use in protecting the <br />bottom lands of the valley, where the greatest damage hae been caused <br />~ past floodS, because moet of these lands are now deep beneath per- <br />ntanent lakes. <br /> <br />Following up this land matter, TVA has purchased over a <br />million acres, and now floods permanently and occasionally, in the area <br />
The URL can be used to link to this page
Your browser does not support the video tag.