Laserfiche WebLink
<br /> <br />. <br /> <br />NJAMIN F. STAPLETON <br />.'o.l:hairma!'-l .Jeo;ver <br /> <br /> <br />. <br /> <br />REDERICK V. KROEGER <br />:.,: Vice-Chairman, Durango <br />~.~ <br />:.,,:JOHN R. FETCHER <br />:C:.;" Steamboat Springs <br /> <br />-:,'" <br /> <br />c. M. FUANEAUX <br />WaJden <br /> <br />RICHARD D. LAMM <br />Governor <br /> <br />FLOYD L. GETZ <br />Monte Vista <br /> <br />DEPARTMENT OF NATURAL RESOURCES <br />COLORADO WATER CONSERVATION BOARD <br />823 STATE CENTENNIAL BUILDING <br />1313 SHERMAN STREET <br />DENVER, COLORADO 80203 <br /> <br />PATRICK A. GORMLEY <br />Grand Junction <br /> <br />ROBERT A. JACKSON <br />Pueblo <br /> <br />DAVID LEINSDORF <br />Crested Butte <br /> <br />August 15. 1980 <br /> <br />HERBERT H. VANDEMOER <br />Sterling <br /> <br />Mr. John Effinger <br />Great Divide Engineering <br />P. O. BOx 605 <br />Canon City, CO 81212 <br /> <br />Dear Mr. Effinger: <br /> <br /> <br />J. WILLIAM McDONALD <br />Director <br /> <br />LAREN D. MORRILL <br />Deputy Director <br /> <br />TELEPHONE <br />1303l839,3441 <br /> <br />As you are aware, Canon city and Fremont county have agreed <br />to supplement. in cooperation with the Colorado Water Conservation <br />Board. their previous floodplain study contract with you. <br /> <br />We therefore request that you prepare a proposal for the <br />proposed work items along the line we have discussed with you at <br />our meeting on June 11. 1980. and as described in our letter of <br />June 19, 1980. <br /> <br />Your proposal should include the following seven work items, <br />with a detailed description of the work to be accomplished under <br />these items, as well as what has been accomplished under your <br />contract with the city and the county. A site map showing the <br />study reaches should be included. <br /> <br />The work items are: <br /> l. Field Reconnaissance and Surveys <br /> 2. Hydrology Analysis <br /> 3. Hydraulic Analysis <br /> 4. Flooded Area Maps <br /> 5. Preparation of Report <br /> 6. Drafting and Publication of Report <br /> (15 copies) <br /> 7. Technical Addendum <br /> <br />- - -- -......... -....... - <br />