My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07500
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:56 PM
Creation date
10/5/2006 3:01:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Crook
Stream Name
South Platte River
Basin
South Platte
Title
Contract Documents for Construction of South Platte Levee and Jetty Improvements
Date
10/1/1987
Prepared For
Crook
Prepared By
Muller Engineering Company, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />PAYMENT BOND <br /> <br />K..~OW ALL MEN BY THESE PRESENTS: that <br /> <br />(Name ot Contracto~ or Company) <br /> <br />and <br /> <br />(Address) <br />(Corporation/Partnership) <br />(Name or SUl:'ety Company) <br /> <br />a <br /> <br />hereinafter ,:al1ed Principal. <br /> <br />(Acidress) -" <br />hereinafter called Surety. are held an~ firmly bound unto <br /> <br />(Name of Recipient) <br /> <br />(Redoient's Address). <br />hereinafte::- called OWNER. in "the penal sum of: $ <br />S in lawful money of the, United States. <br />sum well and trUly to be made. we bind oursl~lves. <br />jointly and severally. firmly by these present~. <br /> <br />Dollars. <br />for d;e"payment of which <br />succ"ssors. and assigns, <br /> <br />THE CONDITION OF THIS OBLIGATION is such that WhUE'as. the Princbal <br />entered into a cer"..ain contract with the OWNER. dated th,~ " <br />day of . 19 . a copy of which is hereto attached and made <br />a part hereof for the construction of: <br /> <br />(Proiect Name) <br /> <br />:-:OW. THEREFORE. if the Principal shall promptly make payment to all persons. <br />firms. SUB-CONTRACTORS. and corporations furnishing materials for or per- <br />forcing labor in the prosecution of the WORK provic.ed f'Jr in such contract. <br />and any aut.!~orized extension or modification thereof, including all amounts <br />due for materials. lubricants. oil. ga$olinc. (:oal and coke. repairs on <br />machinery. equipment and tools. consumed Ot' used in cClnne<:tion with the <br />construction of such WORK. and all i~surance oremiums on said WORK. and <br />for all labor. performed in such WORK whet.l,e; by SUB-CONTRACTOR or <br />otherwise. then this obligation shall be void; otherwise to remain in hll <br />force and enect. <br /> <br />00610-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.