My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07500
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:56 PM
Creation date
10/5/2006 3:01:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Crook
Stream Name
South Platte River
Basin
South Platte
Title
Contract Documents for Construction of South Platte Levee and Jetty Improvements
Date
10/1/1987
Prepared For
Crook
Prepared By
Muller Engineering Company, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SECTION 00530 <br /> <br />CONTRACT <br /> <br />THIS AGREEMENT, made this _ day of <br />between (Corporate Name of Local Public Agency <br />acting herem through its (Title of Authorized OfflCfw.) <br />partnership/an individual doing business as _ <br />Terms), of . County of <br />of . hereinafter <la1le"'~ontractor." <br /> <br />. 19--, by and <br />t herein called "Owner. II <br />. and a corporation/a <br />_ (Strike Out Inapplicable <br />.J and State <br /> <br />WITNESSETH: That for and in consideration of the payments and agreements <br />hereinafter mentioned, to be made and performed by the OWNER, the CONTRACTOR <br />hereby agrees with the OWNER to commence and complete the construction described as <br />follows: <br /> <br />hereinafter called the project, for the sum of __ Dollars <br />($ ) and all extra work in connection therewith, under t.he terms as stated in the <br />General and Supplemental Conditions of the Contract; and at his (its or their) own proper <br />cost and expense to furnish all materials, supplies, machinery, equipment, tools, <br />superintendence, labor, insurance and other accessories and services necessary to <br />complete the said project in accordance with the conditions and prices stated in the <br />Proposal, the General Conditions, and Supplemental General Conditions of the Contract, <br />the plans which include all maps, plats, blue prints, and other 'drawings and printed or <br />written explanatory matter thereof, the specifica.tions and contract documents therefor <br />as prepared by . herein entitled the Architect/Engineer, <br />and as enumerated in Paragraph 1 of the Supplemental General Conditions, all of which <br />are made a part hereof and collectively evidence and constitute the Contract. <br /> <br />The Contractor hereby agrees to commence work under this contract on or before a <br />date to be specified in a written "Notice to Proceed" of the Owner and to fully complete <br />the project within consecutive calendar days thereaftE!r. The Contractor further <br />agrees to pay, as liquidated damages, the sum of $ _ for each consecutive <br />calendar day thereafter as hereinafter provided in Paragraph 19 of the General <br />Conditions. <br /> <br />The OWNER agrees to pay the CONTRACTOR in current funds for the performance <br />of the contract, SUbject to additions and deducticlOS, as provicled in the General <br />Conditions of the Contract, and to make payments on account thereof as provided in <br />Paragraph 25, "Payments to Contractor," of the General Conditions. <br /> <br />00530-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.