My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07500
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:56 PM
Creation date
10/5/2006 3:01:48 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Crook
Stream Name
South Platte River
Basin
South Platte
Title
Contract Documents for Construction of South Platte Levee and Jetty Improvements
Date
10/1/1987
Prepared For
Crook
Prepared By
Muller Engineering Company, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />o <br />w <br />w <br />o <br />" <br />CO <br /> <br />The above unit prices shall include all labor, materials, bailing, shoring, removal, overhead, <br />profit, insurance, etc., to cover the finished work of the several kinds called for. <br /> <br />Bidder understands that the Owner reserves the right to reject any or all bids and to waive any <br />informalities in the bidding. <br /> <br />The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 30 days after <br />the scheduled closing time for receiving bids. <br /> <br />Upon receipt of written notice of the acceptance of this bid, Bidder will execute the formal <br />contract attached, within 10 days and deliver a Surety Bond or Bonds as required under the GENERAL <br />CONDITIONS. The bid security attached in the sum of * <br />($ ) lS to become tne property of the Owner In the <br />event the contract and bond are not executed wlthln the time above set forth, as liquidated damages <br />for the delay and additional expense to the Owner caused thereby. <br /> <br />Respectfully submitted, <br /> <br />By <br /> <br />11tle <br /> <br />(SEAL - If bid is by a corporation) <br /> <br />Address <br /> <br />* Bid security shall be in the amount of five percent of the higher total of total prices for <br />Alternate No.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.