My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07478
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07478
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:12:01 AM
Creation date
10/5/2006 3:01:15 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Jefferson
Community
Lakewood, Denver,
Stream Name
Lakewood Gulch
Basin
South Platte
Title
Flood Hazard Area Delineation
Date
2/1/1979
Prepared For
Lakewood, Denver, Jefferson County
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />17 <br /> <br />Sections were refined so that flow was allowed to pass only <br /> <br /> <br />through areas of "effective conveyance." Areas which had neg- <br /> <br /> <br />ligible "effective conveyance" (space and slope to allow passage <br /> <br /> <br />of water) were eliminated from the appropriate cross sections. <br /> <br /> <br />In general it was assumed that the flood water, after passing <br /> <br /> <br />through a constriction (for example, between two buildings) <br /> <br /> <br />cannot expand at a rate greater than four to one (4:1). Cross <br /> <br /> <br />sections downstream from constrictions were modeled in such a <br /> <br /> <br />way that for each four feet of distance along the channel axis, <br /> <br /> <br />the width of effective flow would expand only one foot on each <br /> <br /> <br />side of the axis. If areas of inundation existed outside of <br /> <br /> <br />the lines of "effective conveyance" drawn as described, they <br /> <br /> <br />were shown on the FHAD Sheets as flooded, but are modeled to <br /> <br /> <br />be ineffective in carrying the flow. <br /> <br />allowed only so far as they would remove an equal conveyance of <br /> <br /> <br />floodwater from each side of the flood plain. <br /> <br />A detailed, technical appendix of hydraulic calculations is <br />available at the office of the Urban Drainage and Flood Control <br />District. <br /> <br />Computations were made and are presented in tabular form of a <br /> <br /> <br />"floodway" along the channel. The floodway is that portion of <br /> <br /> <br />the flood plain which carries the majority of the flood flow. <br /> <br /> <br />It is defined as the remaining channel after a hypothetical en- <br /> <br /> <br />croachment of land is allowed on each side of the channel which <br /> <br /> <br />will not cause more than a nominal rise in the water surface <br /> <br /> <br />over the natural lOO-year flood. The allowed nominal rise in <br /> <br /> <br />water surface used in these computations is no more than one <br /> <br /> <br />half foot. Where possible, the hypothetical encroachments were <br />
The URL can be used to link to this page
Your browser does not support the video tag.