My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07477
CWCB
>
Floodplain Documents
>
Backfile
>
7001-8000
>
FLOOD07477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:53 PM
Creation date
10/5/2006 3:01:13 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
1996 Colorado Flood Report
Date
1/1/1996
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />h a lot of LUCK, serious damages were avoided. There were twenty-one live ost, but <br />they re all a result of water recreationists failing to take proper precautions ather than <br />travellers d building occupants being caught by flooding. <br />"- <br />Since the)lood event of 1993, the Colorado Water Conservation I;k)ard (CWCB) has <br />increased its snoWpack monitoring efforts. The experience with snowpacly/monitoring that was <br />acquired in 1993 ptoyed very useful in 1995. Interestingly enough, at/the start of the 1995 <br />snowpack monitoring etfort, the state's snowpack, which had actually Aleen below average until <br />then, kept increasing at precisely the time when it actually should haye been decreasing (late April <br />and early May). As a resu1t;,the CWCB moved into action and foIfried the state's first Flood Task <br />Force. The Task Force brou~t state and federal agencies, private entities and the media together <br />on a weekly basis for 8 weeks SQ they could collectively shareAnformation about flood conditions <br />and about their response~ to thos~ conditions. The Task F<;>t'c~'s actio~s positively influenced the <br />way governmental agencIes responiho floods and how th}lpubhc perceIves them. <br />\" . <br /> <br />Statewide awareness of "FloM Threat 95" provided potential flood victims with <br />opportunities to implement flood mitig~tion and preparedness measures. Through the efforts of <br />the Colorado Flood Task Force, weekly f<xecasts were provided to the state's emergency and <br />floodplain managers as well as the news med;~.. <br />. "- <br />." "- <br />These forecasts were developedahd prepllted from real time data gathered from its 14- <br />member agencies. The CWCB develo.tfed computeri" d planning tools for flood forecasting that <br />gave state and local officials some al>ility to anticipate od peaks and respond accordingly. The <br />CWCB staff developed snowmeltA'Iood forecast tools wi!" h utilized temperature and snowpack <br />water equivalent to estimate off at 10 selected location These computerized tools proved <br />useful in monitoring and ide IfYing "hot spots" across the st 's river basins. At this point the <br />state's ability to predict the agnitude and timing of snowmelt flo d peaks is not as well refined as <br />many local officials wou like. In a few locations the peak was 0 restimated or underestimated <br />andlor the timing of e peak was different than what was predic d. By and large, in 1995 <br />officials had more vance warning of the flood peaks that they coul xpect than they had ever <br />/ <br />had before. / <br /> <br />Wh,6the flooding was over, the state visited the flooded communities t hold local flood <br />hazard mitIgation planning meetings. At these meetings, all of the counties and m icipalities in a <br />particyJllr watershed were invited to consider preparing plans to identify problems e erienced in <br />~99 and to develop strategies for reducing damages and inconvenience the next ti similar <br />fl ding occurs. It is hoped that the Flood Event of 1995 will prompt some of Co do's <br />ommu~ities to make ~hanges that will make them even better prepared the next time rain an r <br />snow bnng more floodmg. .v w,o(-.. . 0 CA"-~ ~ <br />oJ" iN--'iUlLfSf ~ <br />The 1995 flood event emonstrated,IJhe need for mitigation plans and projects. Many <br />flood mitigation projects are eeded across the state. Following the spring flood season, the <br />CWCB has b several communities which have an interest in preparing such a plan I <br />prier to the n"xl Hesd lh""l ;" thdr eSlHlHlIHities. In e.r1y Julv, Clear Creek County, <br />I Georgetown, Idaho Springs and Silver Plume began developing a local flood hazard riiITig1niOn <br />! plan following a planning "kiCK::Q1f'-meetingconducted by CWCB staff. In additio~,.Ahe <br />: commurpties of Pitkin County, Aspen, Basalt, CarbO!lda1e;~:filenweOO=SpHngs-,~.. . . - unty, <br />: FriscC!,~enrid~_~ihcrtlwrnc;~tezuma,Weld_CQl!l1.ty,--r"ogan County, Wiley and d <br />Ju ction haveoegun to seriously attempt to reduce futurelloud---damages--throug the <br />im ion of flood h.7'olrd mitigativu ,1Ilikl;;;"S. Other &Immunities in . <br />are ceHsid..ring similar efforts. 0 c ..,., p " <br />I /..."'-J I 7, / IV' <br /> <br />~;:... ""-~~ ~ 'fi.t HrM'r ~ ~wt~-~ <br /> <br /> <br />~ <br />ull!"..... <br /> <br />FMW, <br />
The URL can be used to link to this page
Your browser does not support the video tag.