Laserfiche WebLink
<br /> TABLE 7.1a - Overtopping Data e <br />Di scharge Frequency Overtoppi ng Percent Loss <br />cfs yr Depth (ft) Time (hr) Embankment Pavement <br />20,000 10 0 0 0 0 <br />25,000 25 0 0 0 0 <br />30,000 50 0.2 7 0 0 <br />35,000 100 0.7 20 3 7 <br />40,000 200 1.3 40 17 23 <br /> <br />The roadway is 2-1ane with a 10-foot shoulders and 3:1 side slopes. At elevation <br />153, the embankment volume for 2900 feet of roadway is 10,740 CY and the <br />pavement area is 7,733 SY. For the 50-year event, roadway clean up is necessary. <br />This is assumed to cost $2,000. <br /> <br />TABLE 7.1b - Roadway Losses <br /> <br />Disch arge Frequency <br />cfs yr <br />20,000 10 <br />25,000 25 <br />30,000 50 <br />35,000 100 <br />40,00 200 <br /> <br />Embankment (CY) <br /> <br />Losses <br />$ Pavement(SY) <br /> <br />$ <br /> <br />e <br /> <br />296.4 <br />1,679.7 <br /> <br />673 <br /> <br />324.8 <br />1,067.2 <br /> <br />5,700 <br />18,729 <br /> <br />3,813 <br /> <br />Total Roadway Repairs are: <br /> <br />(LAR)50 = $2,000 <br />(LAR)100 = $673 + 5,700 = $6,373 <br />(LAR)200 = $3,812 + 18,729 + 5,000 = $27,542 <br /> <br />e <br /> <br />42 <br />