<br />Example Restoration Costs: Section 1135 Program <br /> <br />As stated, riparian restoration along the Arkansas River below John Martin Dan] could <br />be accomplished ilirough the Corps' Section l135 program. Gross example costs for <br />restoration of 500 acres are given in Table 4-7 (and apply to the Conservation and restoration <br />alternative above, as well as general restoration within the floodway). These costs are based on <br />general unit prices for typical activities and do not reflect site-specific conditions or constraints.. <br />The Section 1135 program requires that the local sponsor acquire a real estate interest in the <br />restoration areas. (Appendix D outlines pertinent aspects of the Section 1135 program). In the <br />example costs, conservation easements were assumed to be tantamount to fee value, and range <br />from $800 to $l,200 per acre. Worth noting is that local sponsors could implement riparian <br />restoration through this program for the approxinlate cost of conservation easements. Areas <br />requiring salt cedar removal would have a correspondingly higher restoration cost. <br /> <br />Table 4-7. Gross cost estimate for a 500-acre riparian restoration project under the Section <br />1135 program. <br /> <br />Activity <br />Feasibility Study & Compliance <br />Plans & Specifications <br />Implementation: <br />Conservation easement <br />Site preparation and seeding <br />Pole planting (33/acre) <br />Fencing (3-strand barbed-wire, <br />250 ft/acre) <br />Post-project monitoring <br />Salt cedar clearing (average) <br />Contingency (15%) <br />Supervision & administration (10%) <br />Total Project Cost <br />Local Sponsor Share (25%) <br />Local Sponsor Share per acre <br /> <br />Unit cost <br />(per acre) <br /> <br />Without Salt <br />Cedar Clearing <br />$ 130,000 <br />80,000 <br /> <br />1,200 <br />900 <br />700 <br /> <br />600,000 <br />450,000 <br />350,000 <br /> <br />625 <br />100 <br />1,000 <br /> <br />312,500 <br />50,000 <br />o <br />265,000 <br />175,000 <br />$ 2,412,500 <br />$ 603,125 <br />$ 1,205 <br /> <br />With Salt <br />Cedar Clearing <br />$ 150,000 <br />100,000 <br /> <br />600,000 <br />450,000 <br />350,000 <br /> <br />312,500 <br />50,000 <br />500,000 <br />340,000 <br />225,000 <br />$ 3,077,500 <br />$ 769,375 <br />$ l,540 <br /> <br />44 <br />