Laserfiche WebLink
<br />I <br /> <br />I I <br /> <br />BO~LE <br /> <br />I <br /> <br />I <br /> <br />215 Union Blvd" Suile 500 <br />Lakewood, CO 80228 <br />TEL: (303)987-3443 <br />FAX: (303)987-3908 <br />www.boyleengineering.com <br /> <br />I <br />I <br /> <br />August 2 I, 2002 <br /> <br />Mr. David Lloyd, P,E, <br />Chief, Capital Construction Program <br />URBAN DRAINAGE AND FLOOD CONTROL D1STRlCT <br />2480 W. 26th Ave" Suite IS6B <br />Denver, CO 80211 <br /> <br />I <br /> <br />I <br /> <br />Ralston/Leyden Creeks Hydrology Update and Flood Hazard Area Delineation <br />UDFCD Agreement No. 01.10.04 <br />Boyle Project No, DN.U02.770.01 <br /> <br />Dear Dave: <br /> <br />I <br /> <br />Boyle Engineering Corporation is pleased to submit the attached hydrology report, which updates the <br />hydrology model for the Ralston Creek watershed, including Leyden and Van Bibber Creeks, This model <br />has been prepared using CUHP and SWMM, and is intended to replace the previous model, which used <br />MITCAT, <br /> <br />I <br /> <br />I <br /> <br />This report summarizes the hydrologic evaluation for the watershed, As directed, we have prepared two <br />models for the watershed, The first model represents future conditions without Leyden Lake or the <br />Arvada/Blunn Reservoir; this model can be used for calibration purposes for comparison to the previous <br />study, The second model adds effects from Leyden Lake, which was recently upgraded, and the <br />Arvada/Blunn Reservoir. These reservoirs were not included in the previous study, but the effects of the <br />lakes can be used for reduction of the floodplain extents, The peak flows are reported for the 10-, 50-, <br />100-, and 500.year storm events for each model. The hydrologic results will be used to prepare a Flood <br />Hazard Area Delineation in the next phase of this project. <br /> <br />I <br /> <br />I <br /> <br />We have enjoyed working with the project sponsors throughout the preparation of this report, <br /> <br />I <br /> <br />Sincerely, <br /> <br />I <br />I <br /> <br />Boyle Engineering Corporation <br /> <br />Ii 1 'I L <br />/J;CL(.4Lr.~ f< 0t..i'-.v'{../t1 <br />/ ~,\\\\\Utl1If1f1l1111. <br />Douglas p, Stewart, p,E,,,,~{,,~O..~Ecl:t110/ <br />~ ,,"v... -.. u J'. ~ <br />Project Manager S ~.....c. P. S'i-...c<'~/. <br />~^'-' .r~ /L' .'V:;::., <br />.::- ~._,XI <~.".-"'\? <br />g~:~ ~..t(;;.~ <br />~ :c:> 29899 "': ~ <br />- . . - <br />S1~ :C::~ <br />~~. .l4..J~ <br />~~.. ..~;:: <br />~~. -" ~ <br />~ ~_n.. .. ~ ~ <br />~ u-.rilJ......{...~,# <br />'111111 N A \. \\\\\\ <br />"'1/"t1t1\1~'YLE ENGINEERING CORPORATION <br /> <br />Ji~~j?hV"c{ <br /> <br />I <br /> <br />Kevin Houck, P,E, <br />Proj ect Engineer <br /> <br />II <br />I <br /> <br />DOCUMENT2 <br />