My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07354
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07354
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:33 PM
Creation date
10/5/2006 2:55:20 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Platte Center Nebraska
Basin
Statewide
Title
Flood Hazard Mitigation Study for Platte Center, Nebraska
Date
8/1/1991
Prepared For
US Army Corps of Engineers
Prepared By
Greenhorne & O'Mara, Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LEVEE AROUND SOUTHYEST CORNER OF TOYN <br /> <br />Levee Height <br />Sideslope <br />Top Yidth <br />X-Section Area <br />Levee Length <br />Volume <br /> <br />7 feet <br />3:1 <br />10 feet <br />217 square feet <br />2,000 feet <br /> <br />434,000 cubic feet <br />16,074 cubic yard <br /> <br />Height of levee based on high water mark at pumphouse (1533.9) <br />Ground elevation at location is 1530; 3.9 feet plus 3 feet of <br />freeboard - 6,9, rounded to 7 <br /> <br />Item Cost Ouantitv Unit Unit Cost Plus 30% Total <br />Excavation with <br />scraper 6,074 c,y. $ 2.00 $9,644 $41,793 <br />Clear tree line 0.40 acre 2,640.00" 317 1,374 <br />Compact embankment 6,074 c,y. .50 ',: 2,4ll 10,448 <br />Levee topsoil <br />(6 inches) 2,000 c,y. 2.60 1,560 6,760 <br />Levee seed and mulch 2.50 ac:re 680.00 510 2,2l0 <br />Real estate costs 6 acre l,350.00 2,430 10,530 <br />Improvements 1 l,s, 3,900,00 1,170 5,070 <br />Damages 1 ' l,s, 400,00 120 520 <br /> Subtotal $78 ,704 <br /> Engineering and design at 15% ll,806 <br /> Supervision and administration at 10% 7,870 <br />.' <br />. Tocal, ',$98,379 <br />.' <br /> <br />Unit costs are based on project estimate along Yood River and Yarm <br />Slough near Grand Island. <br /> <br />. <br /> <br />C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.