My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07346
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07346
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:31 PM
Creation date
10/5/2006 2:54:06 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
South Platte River
Basin
South Platte
Title
Sterling CWCB Construction Loan Application Form
Date
11/5/1998
Prepared For
CWCB
Prepared By
Sterling
Floodplain - Doc Type
Miscellaneous
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CWCB Construction Fund Loan Application <br /> <br />Form Revised March 4, 1998 <br /> <br />8, List an)' feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. (Please submit one copy of each completed study with <br />this application): <br />Flood Haxard Mitigation Feasibility Study available at the Colorado <br />Water Conservation Board office. <br /> <br />9. <br /> <br />What is the estimated cost of the projec:t? <br />estimated Construction costs, if known: <br />Estimated Engineering Costs: <br />Estimated Construction Costs: <br />Estimated Total Costs: <br /> <br />Please include estimated Engineering costs, and <br /> <br />$ 323,000 <br />$2,891,026 <br />$hf14,000 <br /> <br />10, What loan amount and terms are you requesting? (Please call for our current rates before <br />completing this section): <br />Requested Loan Amount: $ --ZOO, 000 (Usually 75% of Estimated TOL,I COSIS) <br />Term (length) of loan: 20 years (Usually 10,20, or 30 yms) <br />Interest Rate: 3 . 5 % <br /> <br />Part C. - Project Sponsor Financial Information <br /> <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project <br /> <br />sponsor have the financial capacity to repay any loans made by the CWCB, The following <br /> <br />information is requested to assist the CWC!3 in a preliminary assessment of the applicant's <br /> <br />financial capacity, It is also requested that the project sponsor submit with this application copies <br /> <br />of the two most recent annual reports, financial statements, corporate reports or other current <br /> <br />documentation of financial condition and operations, <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.