Laserfiche WebLink
<br />e <br /> <br />e <br /> <br />L": <br /> <br />e <br /> <br />I <br /> <br />[ <br /> <br />GC.34 <br /> <br />GC-35 <br /> <br />GC-36 <br /> <br />The CONTRACTOR shall also indemnify and hold harmless the OWNER, the ENGINEER, <br />the OWNER's Representative, and their consultants, and each of their director, officers, <br />employees, and agents from and against all losses, expenses, damages including damages in <br />the WORK itself, attorney's fees, and other costs, including all costs of defense, which any of <br />them may incur with respect to the failure, neglect, or refusal of CONTRACTOR to faithfully <br />perform the work and all of the CONTRACTOR's obligation under the CONTRACT. Such <br />costs, expenses, and damages shall include all cost, including attorneys' fees, incurred by the <br />indemnified parties in any lawsuit in which they are a parry. <br /> <br />SEPARATE CONTRACTS. The OWNER reserves the right to let other contracts in <br />connection with this PROJECT. The CONTRACTOR shall afford other CONTRACTORS <br />reasonable opportunity for the introduction and storage of their materials and the execution of <br />their WORK, and shall properly connect and coordinate his WORK with theirs. If the proper <br />execution or results of any part of the CONTRACTOR's WORK depends upon the WORK of <br />any other CONTRACTOR, the CONTRACTOR shall inspect and promptly report to the <br />ENGINEER any defects in such WORK that render it unsuitable for such proper execution and <br />results. <br /> <br />. The OWNER may perform additional WORK related to the PROJECT by itself, or it may let <br />other contracts containing provisions similar to these. The CONTRACTOR will afford the <br />other CONTRACTORS who are parties to such CONTRACTS (or the OWNER), reasonable <br />opportUnity for the introduction and storage of materials and equipment and the execution of <br />WORK, and shall properly connect and coordinate his WORK with theirs. <br /> <br />If the performance of additional WORK by other CONTRACTORS or the OWNER, is not <br />noted in the CONTRACT DOCUMENTS prior to the execution of the CONTRACT, written <br />notice thereof shall be given to the CONTRACTOR prior to starting any such additional <br />WORK. If the CONTRACTOR believes that the performance of such additional WORK by <br />the OWNER or others involves him in additional expense or entitles him to an extension of the <br />CONTRACT TIME, he may make a claim therefor as provided elsewhere in these General <br />Conditions. <br /> <br />CONTRACTOR'S GUARANTEE. The CONTRACTOR shall guarantee all materials and <br />equipment furnished and WORK performed for a period of one (1) year from the date of final <br />acceptance stipulated in General Condition GC-28 for all WORK performed under the terms <br />of this CONTRACT. The CONTRACTOR shall further warrant and guarantee for a period <br />01' one (1) year from date of final acceptance that all WORK is free from all defects due to <br />faulty materials or workmanship. <br /> <br />The CONTRACTOR shall promptly make such corrections as may be necessary by reason of <br />such defects including the repairs of any damage to other parts of the system resulting from <br />such defects. The OWNER will give notice of observed defects with reasonable promptness. <br />In the event that the CONTRACTOR should fail to make such repairs, adjustments, or other <br />WORK that may be made necessary by such defects, the OWNER may do so and charge the <br />CONTRACTOR the cost thereby incurred. The Performance BOND shall remain in full force <br />and effect through the guarantee period. <br /> <br />PERFORMANCE DURING GUARANTEE PERIOD. The OWNER will observe a standard <br />procedure to request performance by the CONTRACTOR for WORK covered by the <br />Guarantee. <br /> <br />The OWNER will inform the CONTRACTOR of the defects of which it complains, and the <br />CONTRACTOR shall within ten days begin the work of repair or replacement. Should the <br />CONTRACTOR fail to begin such WORK within ten days. the OWNER may make the repairs <br />or replacements at the expense of the CONTRACTOR. If the OWNER determines that <br /> <br />III-26 <br />(1723 - lO/93) <br />