My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOTAL <br />CORPS REAL ESTATE COSTS <br />SPONSOR'S IN KIND <br />I TOTAL REAL ESTATE FEASIBILITY COSTS <br /> <br />2,338 <br />110,531 <br />o <br />110,531 <br /> <br />Subtotal Phases 1-3 <br /> <br />Total = <br /> <br />$29,266 <br /> <br />Subtotal Phases 4-6 <br /> <br />Total = <br /> <br />$81,265 <br /> <br />Proposed Feasibility Study Cost, Phases 1-6 <br /> <br />Total = <br /> <br />$110,531 <br /> <br />5.0 HYDROLOGY <br /> <br />Greeley, Colorado <br />Hydrology Scope of Work <br /> <br />Purpose <br /> <br />The purpose of this study is to develop the hydrologic data necessary to evaluate <br />the water related problems on the Cache La Poudre River in and around Greeley, <br />Colorado. Results of the hydrology study will serve as the foundational basis for <br />understanding the Cache La Poudre River system through Greeley and for making <br />decisions on flood reduction and environmental restoration alternatives. This scope of <br />work was developed to aid the Project Development Team (PDT) in the development of <br />a General Investigation Report/Environmental Impact Statement (GI/EIS) for the Cache <br />La Poudre River through Greeley. A detailed scope of work has been developed for <br />each work task. <br /> <br />Quality Assurance/Qualitv Control (QA/QCI <br /> <br />The Project QAlQC Plan describes quality control and assurance activities. A Quality <br />Control Plan (QCP) will be developed to outline review procedures for study <br />products/deliverables. The QCP should include a description of the QC process, outline <br />of interim review milestones, names and qualifications of reviewers, and an example of <br />comment/issue resolution. The QCP will be submitted for approval by the Corps and <br />local sponsor prior to initiation of the technical study. At the end of the study, a QC <br />Report will be completed that documents the interim peer reviews (Le. comments and <br />responses). A QA review will be performed to ensure that the objectives of the scope <br />have followed the approved QCP. The QC Report will be reviewed to insure that all <br />comments have been addressed. The Corps and the local sponsor will conduct this QA <br />review. Specific items requiring quality review are: <br /> <br />Hvdroloaic Appendix <br />Risk and Uncertainty Appendix <br /> <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.