My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />A. INTRODUCTION. <br /> <br />The scopes of work and cost estimates were prepared by specialists from each <br />discipline and reflect their best projection of the services and cost that will be required to <br />complete the project as currently defined. The costs were then adjusted upwards by <br />15% to account for contingency, Both the work items scoped and the associated costs <br />are presented for negotiation and may not be final values, Within some of the scopes, <br />work items have been identified that could potentially be completed by the Local <br />Sponsor as "work in kind". Actual values for the In-Kind Services tasks will need to be <br />developed jointly by the Sponsor and the Corps of Engineers, Credited In-kind services <br />may include labor hours, such as hourly salaries plus overhead, travel costs and the <br />value of materials, supplies and technical products (such as GIS files), Preliminary <br />values for the In-Kind Services have been estimated and are included in budget and <br />cost estimate figures, The total project cost was increased, by the In-kind-Services, but <br />the cash contribution by the sponsor would not, since the local portion of the cost <br />increase is provided directly as expenditures by the city of Greeley. <br /> <br />1.0 Proiect Cost Estimate <br />The table below presents the current cost estimate for the entire feasibility, It is broken <br />out according to the disciplines doing the study work, <br /> <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.