My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />provided financial information consistent with public law, regulations, and good business <br />practices. The Corps' upper management will also be kept informed of the study status <br />through reports to the Project Review Committee (PRC) and Project Review Board <br />(PRB) and at Quarterly Reviews with NWD. These reports are prepared by the Corps' <br />PM and will discuss accomplishment of project objectives, identify issues, and forecast <br />changes to schedules and costs, Such internal reports will be prepared monthly, <br />quarterly, or annually, according to established District procedures, Fact sheets with <br />condensed information about the project are maintained and updated periodically by the <br />Corps' PM to provide background information to higher authority or to respond to other <br />inquiries, <br /> <br />Given the distance between Greeley, CO and Omaha, NE, software that facilitates team <br />participation, such as GROOVE, may be worth considering, This software allows <br />collaboration on documents and even instant messaging and rapid file transfer that can <br />enhance telephone conference calls, The Corps presently provides free licensed copies to <br />local cost share Sponsors, Additionally, Sponsors may develop a project web site and <br />potentially obtain In-Kind Services credit for the communication effort, Web sites are <br />used to provide information to the local citizens, <br /> <br /> <br />In addition to internal PDT communication, an early priority for the study is to provide <br />for public participation. This includes obtaining timely input from other Federal and <br />State agencies and interested local communities, residents and other stakeholders. This <br />will be accomplished through periodic public meetings and/or workshops, formal and <br />informal interagency coordination, and by allowing all stakeholders the opportunity to <br />review and comment on decision documents (e,g" the feasibility report), <br /> <br />A "Public Involvement Plan" will be developed by the PDT in the Feasibility phase. The <br />purpose of a Public Involvement Plan is to provide information to the public to encourage <br />informed participation in the project and to obtain information from the public so that <br />better planning decisions can be made. The local Sponsor often assumes a lead role in <br />developing the plan. <br /> <br />A permanent project file for this study will be developed and maintained by the PM at the <br />Omaha District in accordance with current District policies. This record file will include <br />all formal correspondence, decision documents, and financial documents relevant to the <br />study in electronic and/or hard copy format, as applicable, <br /> <br />14. VALUE ENGINEERING MANAGEMENT <br /> <br />Value Management is a process to facilitate and encourage the understanding, <br />consideration, and integration of the needs of all customers, PDT members, partners and <br />stakeholders, Value management seeks the highest value for a project by balancing <br />resources and quality and should be applied continuously throughout the life cycle of the <br />project. Value Management is maintaining important functions in regard to efficiency, <br />effectiveness and cost control during the study, At least one VE study shall be performed <br /> <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.