My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07306
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:24 PM
Creation date
10/5/2006 2:52:17 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Cache La Poudre River General Investigation Study, Greeley, CO
Date
5/1/2005
Prepared For
Greeley
Prepared By
USACE, Omaha, NE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PROJECT MANAGEMENT PLAN <br />Table of Contents <br /> <br />PARAGRAPH <br />EXECUTIVE SUMMARY <br />I. PROJECT SCOPE <br />1.1 Location <br />1.2 Proposed Study Effort <br />1.3 Services to be Provided <br />1.4 Key Products <br />1.5 Study Authority <br />1.6 Purpose of the Project Management Plan (PMP) <br />2, WORK BREAKDOWN STRUCTURE <br />2,1 General <br />2,2 In,Kind Services <br />2.3 Work Breakdown Structure by Phase <br />3, FUNDING <br />3.1 Reconnaissance Phase <br />3.2 Feasibility Phase <br />4, CRITICAL ASSUMPTIONS AND CONSTRAINTS <br />5, SCHEDULE <br />6, FEASIBILITY STUDY PROCESS <br />6,1 General <br />6.2 Identify Problems and Opportunities <br />6,3 Inventory and Forecast Conditions <br />6.4 Formulating Alternative Plans <br />6.5 Evaluating Alternative Plans <br />6,6 Comparing Alternative Plans <br />6,7 Selecting a Plan <br />6.8 Review and Approval <br />7, PRODUCT DELlVERYTEAM MEMBERSHIP INFORMATION <br />8. QUALITY CONTROL PLAN AND OBJECTIVES <br />9, ACQUISITION STRATEGY <br />10, RISK ANALYSIS <br />11. SAFETY PLAN <br />12. CHANGE MANAGEMENT <br />13, COMMUNICATION STRATEGY <br />14. VALUE ENGINEERING MANAGEMENT <br />15, CLOSEOUT <br />15.1 Delineation of Phases <br />15.2 Feasibility Phase <br />16 REAL ESTATE <br />17, APPROVALS <br />18, GLOSSARY <br />19, PROJECT MANAGEMENT PLAN APPROVAL <br /> <br /> <br />2 <br /> <br />PAGE <br />3 <br />4 <br />4 <br />6 <br />7 <br />8 <br />8 <br />8 <br />10 <br />10 <br />10 <br />10 <br />13 <br />13 <br />13 <br />14 <br />16 <br />16 <br />16 <br />16 <br />17 <br />17 <br />18 <br />18 <br />18 <br />18 <br />19 <br />21 <br />22 <br />22 <br />23 <br />25 <br />25 <br />26 <br />27 <br />27 <br />28 <br />28 <br />28 <br />29 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.