My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07238
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:14 PM
Creation date
10/5/2006 2:49:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Phillips
Community
Paoli
Stream Name
North Fork Frenchman Creek
Basin
South Platte
Title
Proposal: Floodplain/Flood Control Project Feasibility Study
Date
2/5/1991
Prepared For
State of Colorado
Prepared By
Charles F. Leaf, PE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4 <br /> <br />will be computed and presented for existing and post-construction <br />conditions. <br />The post-construction conditions will use the proposed flood <br />control project design features. These features will be described <br />and discussed in the final design section. <br /> <br />3. Flood Boundary Deli nea t ions <br /> <br />A delineat'ion of the floodplains will include: <br />o 100-and 500-year boundaries (existing and post-construction). <br />o Location and alignment of cross sections, flood elevation refer- <br />ence 1 ines, and flowl ine s':,ationing used in the hydraul ic <br />analysis model. <br /> <br />4. Field Control Surveys <br /> <br />The consultant will complete the follow'ing survey tasks for the <br />floodplain analysis and flood control project design. <br />a) Acquisition of recent aerial photography frocl the U.5 .D.A. <br />ASCS Aerial Photography Field Office of the study reach at <br />a scale 1" = 200'. <br />b) Estab 1 i shment of a base suv'vey 1 i ne for the proposed 1 evee <br />system ,3nd center 1 ine of the floodway channel (PLATE 1). <br />The base survey line will be identified in the field so that <br />it can be re-established at the time of construction or if <br />needed for other uses. Th'is survey will be a controlled <br />traverse survey with monum~!ntati on. <br />c) Survey of cross-sections of the existing channel and the <br />overflow channel at locations designated by the consultant <br />and approved by thE! town or their representatives. Cross <br />sections will be extended il Illinimum of 100-feet either side <br />of the design floodplain. <br />d) Survey of channel and valll~Y cross-sections for' hydrillJlic <br />routings. These cross-sections shall be located between <br />County Road 19 and County Road 23. In addition, the consu'ltant <br />'I: <br />will select additional design cross sections as necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.