Laserfiche WebLink
<br />2 <br /> <br />6. Project Schedule and Budget <br />7. Qual ifications ,_-.R~sumes of Te_~rn_~teL18':!:~ ancLDes~illti().n,~J <br />Representative Projects:_ <br /> <br />~ tud~ Reach <br /> <br />The project area extends from County ROild 23 at the downstream (east) <br />end to County Road 19 at the upstream (west) Emd (Plate 'I), The study reach <br />i ncl udes the ma i n channel of the North FOt'k I'renchman CreeK and the overflow <br />channel of the North Fork Frenchman Ct'eek in the vicinity of Paoli, Colorado. <br />The feasibility study will consider alt,'!rnatives to provide a high level <br />of flood protection to the town. Some of the alternatives to be considered <br />include channel cleaning, levee construction. roadway modifications, and <br />bridge modifications. By the implementation of the f'lood c:ontt'O'l project <br />recommended in the feasibility study, virt.lally all of the community will be <br />removed from the 500-year floodplain. which 'is similalr to the area affected <br />'1/ <br />by the July 30, 1989 flood (Colorado ~Iater Conservation Board, 1990)--, <br />One alternative which will be studied i:,; shown on PLATE 1. It consists <br />of a levee system extending from CO RD 19 a'long the H'ighway 6 right of way <br />to the southeast corner of the town 1 imits ilnd thence east along the south <br />boundry of the town limits. Culverts would be provided in the levee where <br />the North Fork is crossed by Highway 6 and Burl ington Northern Railroad. <br />At this location, the upstream channe'l would be designed t.o convey <br />flows up to but exceeding the capacity of thE,' hi ghway and ra il mad ad dges, <br />respectively. Higher flows would be cOl1veyec east dOlm a f'loodway along <br />the path taken by the July 30, 1989 flood ',~I/E'nt. CO RD 21 would be modified <br />to provide adequate capacity to safely pass 'iOO-year flood flows and to <br />CI"OSS over the proposed levee at this location. <br /> <br />~;()P!~ of Servi ces <br /> <br />The following work tasks will be addressed in each proposa'l. These <br />tasks will provide engineering services for il floodplain study and Pt'oposed <br />n ood control project. The bas i c products i ncl udi ng drawi ngs and general <br /> <br />Y"Post Flood Report, North Fork Frenchman Creek, July 30, "989..Flood Event." <br />