Laserfiche WebLink
<br />9 <br /> <br />TABLE 1: PROJECT BUDC:,ET <br /> <br />!il'Q!aul i c Ana lysi s S 2,000.00 <br />a. existing <br />b. post-project <br />c. field reconnaissance <br />IOlood Boundary Del ineations '+00.00 <br />a. project base maps <br />b. location and a'lignment of cross-sections, <br />flowline stationing, flood elevat'ons, <br />water surface profil es <br />Fiel d Control Surveys 3,400.00 <br />a. aerial photogr,1phy (base maps) <br />b. base survey line <br />c. valley and channel cross-sections <br />d. utilities, improvements, property <br />ownership <br />Preliminary Design 2,700.00 <br />a. map & conceptual pl an <br />b. flood channel <br />c. levee <br />d. plans and specifications <br />_Report:...., <br /> <br />__---'Goog".oo__ <br /> <br />TOTAL ESTIMATED COST <br /> <br />$, 9,500.00 <br /> <br />TABLE 2: STANDARD FEE SCHEDULE <br /> <br />CHARLES F .:....J:I6!'_!___p,X~ <br /> <br />Principal Water Resources Engineer <br />Water Resources Engineer <br />Secretarial <br />Expenses <br /> <br />$, 65.00/hr, <br />40.00/hr. <br /> <br />25.00/hr, <br />P,ctua 1 Cost <br /> <br />(mileage-.26/mile) <br />