My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07238
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07238
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:14 PM
Creation date
10/5/2006 2:49:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Phillips
Community
Paoli
Stream Name
North Fork Frenchman Creek
Basin
South Platte
Title
Proposal: Floodplain/Flood Control Project Feasibility Study
Date
2/5/1991
Prepared For
State of Colorado
Prepared By
Charles F. Leaf, PE
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br /> <br />selected plan. This plan will include a conceptual plan for the <br />town and Phillips County. A prel'inrinary desiign of the selected <br />"plan-of-improvement" will provide the town and Phi 11 ips County <br />with quantities, cost estimates, and hydrauljic routings of the <br />design flood water surface elevat'ions for the proposed projE!ct. <br />The evaluation will provi de confi dence in the workabili ty of the <br />flood control project. <br /> <br />2. Levee Des i gn <br /> <br />The preliminary levee design win comply ~Iith the E!=.cieraJ_ <br />Emergency Management Agency's l.evl,~e_i'9ltcy for Sta.Qdards a~ <br />Requirements. These requirements utilize the U.S. Army Corps of <br />Engineers [COE) criteria as outlined in the engineering manual <br />Design and Construction of Levees (EM 1110-2.,1913 dated March 31, <br />1978). Conflicts in any criteria, as determi'ned by consultant, <br />will be resolved at the directl'on of the town, Phillips County <br />and Colorado Water Conservation Board. The levee project will be <br />des i gned for the 500-year flood f,"equency eVE!nt. <br /> <br />3. Selected Design Reporting <br /> <br />The selected design and the resulting plans and specifications <br />wi 11 address: <br />a) Location, extent and details for the flood control project. <br />b) Typical project requirements for levee foundation and embankment. <br />c) Prel iminary recolT!1lendations for <br />o Locati'on, rock size, and riprap requirements, <br />o Revegetation of levee and channel areas, <br />Q Landslide drainage concerns "or the levee system, <br />o Borrow and material disposa'[ areas for the project and <br />d) Interior drainage system for a 1 E!vee system. <br /> <br />4. Coordinati on <br /> <br />The consultant will coordinate in cooperation with the <br />
The URL can be used to link to this page
Your browser does not support the video tag.