Laserfiche WebLink
<br />" <br /> <br />Page 3 of 5 . I: Issue, Da~e: J UNO 3 2004 <br /> <br />. I EftectlveDate: OCT 0, 7 20041 Case No.: 03-08-0689P , ILO,,!~Ap'P, <br /> <br />',:" , <br /> <br />I' <br /> <br />~1j\R7Af~ <br />~~;I-:\ <br />I:D~'~; <br />'?" " <br />,7., "'~ <br />(iND s~v:; <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION <br /> <br />We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (p.L. 93-234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, <br />P.L. 90-448), 42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 oflhe National Flood Insurance Act of 1968, as <br />amended, communities participaling in the NFIP are required to adopt and enforce floodplain management regulations that meel or <br />exceed NFIP criteria. These criteria, including adoption of Ihe FIS report and FIRM, and the modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more stringent State/Commonwealth or local requirements <br />to which the regulations apply. <br /> <br />We provide the floodway designation 10 your community as a tool to regulate floodplain development. Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3(d) of the NFIP regulations <br /> <br />NFIP regulations Subparagraph 60.3(b )(7) requires communities to ensure that the flood-carrying capacity within the al1ered or relocated <br />portion of any walercourse is maintained. This provision is incorporated into your community's existing floodplain management <br />ordinances; therefore, responsibility for maintenance of the modified channel and culvert rests with your community. We may request <br />that your community submit a description and schedule of channel and culvert activities. <br /> <br />This determination is based on the flood data presently available. The endosed documents provide additional information regarding this determination. If <br />you have any quesUons about this document. please contact the FEMA Map Assistance Center toll free at 1-877-336-2677 (1-877-FEMA MAP) or by letter <br />addressed to the LOMR Depot. 3601 Eisenhower Avenue, Alexandria, VA 22304. Additional information about the NF1P is available on our website at <br />htto:/IWNW.fema.aov/nfio. <br /> <br />~C:~ <br /> <br />Kevin C. Long, CFM, Project Engineer <br />Hazard Identification Section <br />Mitigation DiviSion <br />Emeraencv Preoaredness and Resoonse Directorate <br /> <br />102426 D.A03080689 1021AC <br />