Laserfiche WebLink
<br />'. <br /> <br />., <br /> <br />Page 3.915:.,1 Issu~ .Dale.:. luti n 32004 . I E.ffecti.ve.D~Ie: OCT. 007 2004.1 Case No,: 03-08-.D.689P . .1L,()II<1R:APP' <br /> <br />- <br />4VART"'A <br />,~.* ;.t,.~ <br />g.,", Federal Emergency Management Agency <br />\~~ Washington, D.C. 20472 <br />~.(<1NPS"'i.~ <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULA nONS/COMMUNITY OBLIGA nON <br /> <br />We have made lbis delermination pursuant to Section 206 oflbe Flood Disaster Protection Act of 1973 (p.L 93-234) and in accordance <br />with lbe National Flood Insurance Act of 1968, as amended (Title XIII oflbe Housing and Urban Development Act of 1968, <br />P.L 90-448), 42 U.S.c. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating in lbe NFIP are required 10 adopt and enforce floodplain management regulations that meet or <br />exceed NFIP crileria. These criteria, including adoption of the FIS report and FIRM, and Ihe modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more striugent State/Commonwealth or local requirements <br />to which the regulations apply. <br /> <br />We provide the floodway desigualion 10 your community as a tool 10 regulate floodplain development Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriale <br />community aClion, as specified in Paragraph 60.3(d) of lbe NFIP regulations <br /> <br />NFIP regulations Subparagraph 60.3(b)(7) requires communities 10 ensure that the flood-carrying capacity within the altered or relocated <br />portion of any watercourse is maintained. This provision is incorporated into your community's existing floodplain management <br />ordinances; therefore, responsibility for maintenance of the modified channel and culvert rests with your community. We may request <br />that your community submit a description and schedule of channel and culvert activities. <br /> <br />This determination is based on the flood data presenUy available. The enclosed documents provide additional information regarding this detennination. If <br />you have any questions aboul this document. please contact the FEMA Map Assistance Center toll free at 1-877-33&-2677 (1-877-FEMA MAP) or by letter <br />addressed to the LOMR Depot, 3601 Eisenhower Avenue, Alexandria, VA 22304. Additional infonnation about the NFIP is available on our website at <br />htto://www.fema.aov/nfio. <br /> <br />~e~ <br /> <br />Kevin C. Long, CFM, Project Engineer <br />Hazard Identification Section <br />Mitigation Division <br />Emeraencv Preoaredness and Resoonse Directorate <br /> <br />102426 D.A03080689 1021AC <br />