Laserfiche WebLink
<br />3 ' <br /> <br />it is planned for and implemented at the local level, by the entities who are most knowledgeable of local <br />conditions and whose economic stability and safety are at stake. For your information, we are enclosing <br />a copy of a pamphlet describing this nationwide initiative. For additional information on Project Impact, <br />please visit our website at www.fema.l!ov/imoact. <br /> <br />If you have any questions regarding floodplain management regulations for your community or the NFIP <br />in general, please call the CCO for your community at the telephone number cited above. If you have <br />any questions regarding this LOMR, please call our Map Assistance Center, toll free, at <br />1-877-FEMA MAP (1-877-336-2627). <br /> <br />Sincerely, <br /> <br />~ ?A)~ <br /> <br />Sally P. Magee, Project Engineer <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />For: Matthew B. Miller, P.E., Chief <br />Hazards Study Branch <br />Mitigation Directorate <br /> <br />Enclosures <br /> <br />cc: Mr. JayN. Hutchison <br />City Engineer <br />City of Lakewood <br /> <br />Mr. Bill DeGroot, P.E. <br />Chief, Floodplain Management Program <br />Urban Drainage and Flood Control District <br /> <br />Mr. Bruce A. Behrer, Jr., P.E. <br />Project Manager <br />Muller Engineering Company, Inc. <br /> <br />, <br />