My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07184
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07184
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:11:05 PM
Creation date
10/5/2006 2:47:31 AM
Metadata
Fields
Template:
Floodplain Documents
Designation Number
191
County
Montrose
Community
Olathe
Basin
Gunnison
Title
Flood Insurance Study - Olathe, Montrose County, Colorado
Date
3/1/1982
Designation Date
8/1/1982
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />FLOOD INSURANCE STUDY <br /> <br />1.0 INTRODUCTION <br /> <br />1.1 Purpose of Study <br /> <br />This Flood Insurance Study investigates the existence and severity <br />of flood hazards in the Town of Olathe, Montrose County, Colorado, <br />and aids in the administration of the National Flood Insurance <br />Act of 1968 and the Flood Disaster Protection Act of 1973. This <br />study will be used to convert Olathe to the regular program of <br />flood insurance by the Federal Emergency Management Agency. Local <br />and regional planners will use this study in their efforts to <br />promote sound flood plain management. <br /> <br />In some states or communities, flood plain management criteria <br />or regulations may exist that are more restrictive or comprehensive <br />than those on which these federally supported studies are based. <br />These criteria take precedence over the minimum Federal criteria <br />for purposes of regulating development in the flood plain, as <br />set forth in the Code of Federal Regulations at 24 CFR, 1910.1(d). <br />In such cases, however, it shall be understood that the State <br />(or other jurisdictional agency) shall be able to explain these <br />requirements and criteria. <br /> <br />1.2 Authority and Acknowledgments <br /> <br />The source of authority for this Flood Insurance Study is the <br />National Flood Insurance Act of 1968, as amended. <br /> <br />The hydrologic and hydraulic analyses for this study were performed <br />by MSM Consultants, Inc., for the Federal Emergency Management <br />Agency, under Contract No. H-4710. This work, which was completed <br />in March 1981, covered all significant flooding sources affecting <br />Olathe. <br /> <br />1.3 Coordination <br /> <br />An initial coordination meeting was held in the Town of Olathe <br />on March 23, 1978. This meeting attended by representatives of <br />the Town of Olathe, the Federal Emergency Management Agency, the <br />study contractor, and Montrose County was held to discuss the <br />nature and purpose of the study and the scope and limits of work. <br /> <br />On January 25, 1979, an intermediate coordination meeting was <br />held in the City of Montrose to discuss the progress of the study <br />and the limits of work. In attendance were representatives of <br />Montrose County, the Federal Emergency Management Agency, the <br />Colorado Water Conservation Board (State coordinator), and the <br />study contractor. No representatives from Olathe attended. <br /> <br />The following agencies and individuals were contacted and supplied <br />information used in the preparation of this study: the U.S. <br />
The URL can be used to link to this page
Your browser does not support the video tag.