Laserfiche WebLink
<br /> <br />.. . .... . . <br /> . <br /> BROWN DITCH WEIRS BOAT CHUTES <br /> PROPOSED COSTS <br /> PAGE 6 <br /> A. FIELD AND OFFICE ENGINEERING <br /> River Hydrology $ 650 <br /> Hydraulic Analysis $2,100 <br /> Evaluation $ 600 <br /> Preliminary Design $1,800 <br /> Final Design $3,350 <br /> SUBTOTAL $ 8,500 <br /> B. PROTOTYPE ANALYSIS (1 Day Backhoe) $6,000 <br /> SUBTOTAL $ 6,000 <br /> C. SUPPORT FACILITIES <br /> Take-out landing (2) $1,000 <br /> Put-in Landing (2) $1,000 <br /> Portage Trail $1,200 <br /> Signage $ 800 <br /> SUBTOTAL $ 4,000 <br /> O. COORDINATION MEETINGS IN OMAHA, NEBRASKA <br /> Two trips with two engineers each <br /> ($1,500 per trip) $3,000 <br /> SUBTOTAL $ 3,000 <br /> E. REIMBURSABLE EXPENSES <br /> Printing and Postage $ 300 <br /> Telephone $ 150 <br /> Survey Supplies $ 250 <br /> Auto $ 400 <br /> Photography and Video $ 700 <br /> SUBTOTAL $ 1,800 <br /> TOTAL $23,300 <br /> I <br />