Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />- HYDROLOGIC AND HYDRAULIC DETERMINATIONS - <br /> <br />Des i gn Ra i n fa 11 <br /> <br />Basin Parameters <br /> <br />That portion (about 601) of the Sloans Lake Drainage Basin lying north <br />of Colfax Avenue and west of Sheridan Boulevard is located in Township 3 <br />South, Range 69 West (Jefferson County). That portion (about 35%) of the <br />Basin lying north of Colfax and east of Sheridan is in Township 3 South, <br />Range 68 West (Denver County). A very small portion (about 5%) lies south <br />of Colfax Avenue and is in Township 4 South, Ranges 68 and 69 West. The <br />design rainfall presented in the Rainfall/Runoff Information Report pub- <br />lished under Project REUSE for these townships and ranges varies insig- <br />nificantly. The values for Jefferson County are generally sl ightly higher <br />and were the values used for runoff computations in the Sloans Lake Basin <br />hydrologic investigation. These data are presented in Tables B-1 and B-2 <br />of Appendix B. The depths and durations were computed for the four design <br />rainfalls (5-, 10-,25- and 100-year) to include a breakdown for a five <br />and ten minute duration. <br /> <br />Each sub-basin was physically described in terms of tributary area to <br />each design point, sub-basin length, distances from sub-basin centroid <br />to design point, degree of perviousness throughout the basin and the <br />selection of representative coefficients typical of the basin. Numer- <br />ous field visits were made to become familiar with the physical charac- <br />teristics of each sub-basin, to aid in making necessary judgements con- <br />cerning adjustments to coefficients relating peak flows and time to <br />peak. All available records of existing storm sewers were gathered <br />from the municipalities in the Basin and were studied to determine the <br />extent, capacity and effects on runoff of the existing storm drainage <br />facilities. <br /> <br />Percent of imperviousness was determined by measuring impervious surface <br /> <br /> <br />areas of eight sample street blocks throughout the basin. The selected <br /> <br /> <br />blocks were judged to be typical of fully developed representative areas <br /> <br /> <br />for the various sub-basins. Field visits verified the development charac- <br /> <br />teristics of the sample blocks. <br /> <br />After evaluation of the soi 1 characteristics, infiltration rate and <br /> <br /> <br />pervious runoff, the following hydrological factors were selected and <br /> <br /> <br />used in the computation of storm hydrographs: <br /> <br />Sol I Infi ltration: <br /> <br />The coefficients used in the computation of the unit hydrographs, C <br />t <br />(coefficient reflecting time to peak) and C (coefficient related to peak <br />p <br />rate of runoff) were determined and adjusted in accordance with the pro- <br />cedure contained in the Urban Storm Drainage Criteria Manual. <br /> <br />First 1/2 Hour Remainder of Storm <br /> <br /> <br />5-year Return Period I inch/hour 0.5 inch/hour <br /> <br /> <br />10-year to 100-year Return <br /> <br />Period 0.5 inch/hour 0.5 inch/hour <br /> <br /> <br />Impervious Depression and Detention Storage: 0.1 inches <br /> <br /> <br />Pervious Depression and Detention Storage: 0.3 inches <br /> <br />Table A-l in Appendix A lists the information developed for the various <br />parameters associated with the Sloans Lake Basin hydrologic investigation, <br />based on a totally developed study area. <br /> <br />7 <br />