Laserfiche WebLink
<br />~ <br />~ <br />tie, /t~ <br /> <br />/ <br /> <br />July 3, 1978 <br /> <br /> <br />Hs, Ann ThODlas <br />Pederal Insuranoe Administration <br />451 7th Street, S'W <br />Washington, D,C, 20410 <br /> <br />Dear Ann: <br /> <br />This letter is to followup on our reo~ndation for oompletion <br />of the Breokenrid':j'. Flood Insurance Study as described in our <br />Speoia1 Problem a..port of June 23, 1978 (attached). Thh <br />report describes ~ additional scope of work required to <br />provide the oOlll1llwlity wii:h an aocurate floodplain study and <br />recommends a oon~~aot amendment, <br /> <br />'1'he tasks whioh will require additional effort inolude <br />reoonnaissanoe, hydraulics, work ma.p preparation, and ooordi- <br />nation. The addi1:iona1 work load is estimated .s follows: <br /> <br /> (~. of hours) <br /> Teohnical <br /> ~,Manaqer Proj,Bnq. Bnq, DraftSJlUUl Surveyor <br />).;' . !leoonnai.sance 4 4 8 - - <br /> Land Survey 64 <br /> Hydraulics 2 8 24 10 <br /> Work Map PreparatJ.on 2 4 16 10 <br /> Other (Coordinatie,n) .L 4 8 - <br /> - <br /> TOTALS 12 20 56 20 64 <br /> <br />The cost of these services is shown in detail on Po~ 745, <br />Cost and Price Ana,lysis (attaohed), <br />