My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07029
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:38 PM
Creation date
10/5/2006 2:42:08 AM
Metadata
Fields
Template:
Floodplain Documents
County
Weld
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Floodway and Floodplain Analysis
Date
1/20/1994
Prepared For
Greeley
Prepared By
Brown & Caldwell
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REVISION REQUESTOR AND COMMUNITY OFFICIAL FORM <br /> <br />Operation and Maintenance <br /> <br />. Does the physical change involve a flood control structure (e.g., levees, f100dwalls, <br />channelization, basin~,damsl? [J Yes [Xl No <br /> <br />If yes, please provide the following information fOlr each of the new flood control structures: <br /> <br />A. Inspection of the flood control project will be conducted periodically by <br /> <br />with a maximum interval of._ <br /> <br />(eatityl <br />mOIl.ths between inspections. <br /> <br />B. Based on the results of scheduled periodic inspections, appropriate maintenance of the flood <br />control facilities will be conducted by ___ <br /> <br />(eatit)>) <br /> <br />to ensure the integrity and degree of flood protection of the str\lcl;ure. <br /> <br />C. A formal plan of operation, including documentation of the flood warning system, specific <br />actions and assignments of responsibility by indi1fidual name or 'litle, and provisions for <br />testing the plan at intervals not less than one year, 0 has 1:] has not been prepared <br />for the flood control structure. <br /> <br />D. The community is willing to assume responsibility for 0 performing 0 overseeing <br />compliance with the maintenance and operation plans of the (Name) <br />flood control structure. If not performed promptll' by an owner ol;her than the community, <br />the community will provide the necessary services without cost to the Federal government. <br /> <br />Attach operation and maintenance plans <br /> <br />Requested Response from FEMA <br />. <br /> <br />. After examining the pertinent NFl}> regulations and reviewing the document entitled ft Appeals, <br />Revisions, and Amendments to Flood Insurance Maps: A Guide for Community Officials," dated <br />January 1990, this requesUs for a: <br /> <br />_a. CLOMR <br /> <br />A letter from FEMA commenting on whether a proposed project, if built as <br />proposed, would justify a map revision (LOMR or PMR), or proposed <br />hydrology changes (see 44 CFR Ch. I, Parts 60, 65, and 72). <br /> <br />~b. LOMR <br /> <br />A letter from FEMA officially revising the current NFIP map to show <br />changes to floodplains, floodways, or flood elevations. LOMRs typically <br />depict decreased flood hazards. (See 44 CFR Ch. I, Parts 60 and 65.) <br /> <br />_c. PMR <br /> <br />A reprinted NFlI' map incorporating changes to floodplains, floodways, or <br />flood elevations. Because of the time and cost in'.olved to change, reprint, <br />and redistribute an NFlI' map, a PMR is usually processed when a revision <br />reflects increased flood hazards or large-scope changes. (See 44 CFR Ch. I, <br />Parts 60 and 65.) <br /> <br />_d. Other: <br /> <br />Describe <br /> <br />October 1992 <br /> <br />Page 3 of5 <br /> <br />APPUCATlONlCERTlnCATlON FORMS FORCONDmONALLETTER OF MAP RF.VtSIOW-. LE'M'D OFMAPJlEVISJON AHDPHYSlCALMAP REVISION <br />
The URL can be used to link to this page
Your browser does not support the video tag.