My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD07020
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD07020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:37 PM
Creation date
10/5/2006 2:41:35 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Statewide
Title
Flood Hazard Mitigation Plan for Colorado
Date
2/1/1998
Prepared For
CWCB
Prepared By
Kistner and Associates
Floodplain - Doc Type
Flood Mitigation/Flood Warning/Watershed Restoration
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1998 . ClIItJratkJ FIDBtJ HaZllnl Mitigation Plall (409) <br /> <br />. <br /> <br />general analysis to assure basic compliance with state <br />and federal requirements. The second step is a <br />hydraulic analysis, where specific design criteria are <br />followed. These' specific studies may be sent to the <br />Colorado Water Conservation Board to assure com- <br />munication on common concerns. <br /> <br />Potential secondary impacts of highway construction, <br />such as encouraging land use in the floodplain by <br />building a highway in the floodplain, have to be ad- <br />dressed to satisfy federal requirements. But many <br />COOT offICials believe transportation systems gener- <br />ally follow land use rather than creating it, and if <br />problems occur, they are the resuit of land use deci- <br />sions made by local govemments rather than the <br />result of COOT policies and procedures. <br /> <br />In designing its own buildings, CDOT considers flood- <br />plain impacts. In Eagle County, for example, the <br />floodplain was one factor in the design of a new area <br />to house COOT employees. Flood insurance for <br />existing buildings in the floodplain has been purchased <br />for some CDOT structures. <br /> <br />tit <br /> <br />In the event of a flood disaster, COOT does not place <br />any conditions on the provision of emergency assis- <br />tance (such as a written agreement to manage the <br />floodplain to a certain standard). After emergency <br />assistance had been provided, conditions on future <br />assistance might be considered. <br /> <br />3.2.1.6 Department of Public Health and <br />Environment ICDPHE) <br /> <br />3.2.1.6.1 Water .Quality Control Division <br /> <br />The Water Quality Control Division is moving forward <br />with a major reorganization, which moves aNaY from a <br />programmatic structure toward a more simplified, <br />functional structure, The current sections will combine <br />to form two new sections: a Watershed Section and a <br />Water Quality Protection Section. An important com- <br />ponent of the new organizational structure will be four <br />watershed teams (South Platte, ArkansaslRio Grande, <br />Upper Colorado, and Lower Colorado) that draw from <br />staff in each of the sections described above to pro- <br />vide an ongoing mechanism to coordinate overall <br />program efforts within each watershed. <br /> <br />The role of the Colorado Department of Public Heaith <br />and environment OMs ion of Water Quality Control, in <br />floodplain management relating to wastewater facili- <br />ties includes three areas of involvement First are site <br />applications; an applicant requests approval to build a <br />specific wastewater treatment facility in a specifIC <br />location. Second are construction grant applications; <br />an applicant requests federal financial assistance in <br />building a wastewater treatment facility, either concur- <br />rent with or after a site application. Third is discharge <br />permit applications; anyone who wishes to discharge <br />pollutants (including treated waste) into a body of <br /> <br />. <br /> <br />water in Colorado must hold a discharge permit. All <br />three of these processes have the potential to include <br />flood hazard mitigation opportunities. <br /> <br />Drinking Water Program <br /> <br />The Drinking Water Program is responsible for ensur- <br />ing safe drinking water for the general public. Most of <br />Colorado's residents receive their domestic water from <br />community water systems. Since water is a potential <br />carrier of disease, water supplies must be carefully <br />treated to ensure their safety. This is accomplished <br />through the maintenance and enforcement of the Pri- <br />mary Drinking Water Regulations. The Drinking Water <br />Program also develops and updates design criteria for <br />residential water systems, issue enforcement orders <br />for violations and maintains an inventory of public <br />water supplies. The Drinking Water Section of the <br />Water Quality Control OMsion reviews applications for <br />domestic water supply facilities, All portions of the <br />water supply system as far as the plant outlet, with the <br />exception of intake structures, must be located outside <br />the 100-year floodplain. Typically, parties building <br />water supply facilities locate the intakes in the flood- <br />plain, for obvious reasons, and then divert the water to <br />a high place for treatment and storage. By Iocaling <br />the facilities above the floodplain, increased pressure <br />is applied to the distribution system and locating the <br />facilities above the floodplain reduces pumping costs. <br />Therefore, floodplains are evaluated at the time plans <br />and specifications are reviewed prior to construction of <br />water treatment plants. <br /> <br />Permits and Enforcement <br /> <br />The Permits and Enforcement Section develops and <br />administers discharge permits for approximately 1,070 <br />domestic and industrial wastewater producers who <br />discharge treated effluent to state waters. The sec- <br />tion's staff also enforces the terms of the permits, <br />using monitoring information provided by the field <br />staff, and data fumished by the permittees in the form <br />of discharge monitoring reports. Various actions may <br />be taken to bring the facility back into compliance, <br />including technical assistance, compliance orders and <br />fines. Upon delegation by Environmental Protection <br />Agency (EPA), the section will be responsible for the <br />industrial pretreatment program, and for permitting <br />federal facilities located within the state. Pretreatment <br />is the processing of industrial wastes before they enter <br />a domestic wastewater treatment plant Pretreatment <br />is necessary for certain types of wastes in order to <br />protect the treatment facility, ensure that the facility <br />will be able to meet the terms of its discharge permit, <br />and ensure the quality of biosoids produced at the <br />faci lity. <br /> <br />The section regulates the recycling of domestic <br />sewage sludge (biosolids) as a fertilizer or soil amend- <br />ment Authorization is required before biosolids may <br /> <br />~~ <br /> <br />Chapfler 3.13 <br /> <br />1/2819810:51 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.