My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06980
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:30 PM
Creation date
10/5/2006 2:40:37 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Basin
Arkansas
Title
Pueblo Early Warning Systems
Date
2/19/1998
Prepared For
Pueblo County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />" . <br /> <br />. <br /> <br />. <br /> <br />IV. Cost Estimate <br />A. Cost Breakdown <br />B. Description of Non-FEMA Funding Sources (attach Letters of Funding <br />Commitment from those sources) <br />C. Estimated Expenditures <br />. Project management <br />. Engineering <br />. Design <br />. Labor <br />. Materials & supplies <br />. Equipment <br /> <br />V. Cost Effectiveness <br />A. Useful Life of Project <br />B. Annual Maintenance Cost <br />C. Frequency and Severity of Recent Flood Events (1997 event ifapplicable, <br />other recent major events whether 1997 is applicable or not) <br />D. Estimate of DolIar Amount of Damage to be Prevented <br />E. Justification to Support Estimate <br />F. Number of People Protected by Proposed Project <br />G. Value of Property Protected by Proposed Project <br /> <br />VI. National Flood Insurance Program Information <br />A. Community Participation In NFIP and Compliance With NFIP <br />B. Relation of Project Site to FEMA-Mapped Floodplain or Floodway <br />C. If Applicable, Hydraulic Analysis of Project's Floodway Impacts (no rise) <br />D. Confirmation from Local Floodplain Administrator of Compliance of <br />Project With Local, State and NFIP Requirements <br /> <br />VII. Environmental Information <br />A. Completed FEMA Environmental Checklist <br />(This checklist has been attachedfor your information) <br />B. Attached Consultation Letters from Local, State and Federal Agencies <br />(Note that some of these agencies require 30 days or more to respond to <br />requestsfor letters) <br />VIII. Work Schedule <br />A. Mitigation Project Work Schedule/Summary Report <br />B. Forms for Quarterly Tracking of Project <br /> <br />IX. Authorization <br />. Signed Copy of FEMA Statement of Intent to Comply <br />
The URL can be used to link to this page
Your browser does not support the video tag.