My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06980
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:30 PM
Creation date
10/5/2006 2:40:37 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Basin
Arkansas
Title
Pueblo Early Warning Systems
Date
2/19/1998
Prepared For
Pueblo County
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />DEe-lS-S? 11_18 FROM.HDR ENG DENVER <br /> <br />ID1303860?13S <br /> <br />PAGE <br /> <br />2/2 <br /> <br />. <br /> <br />. <br /> <br />HDR HOURLY RATE SCHEDULE <br />1998 <br /> <br />The fol/owing rates apply to projects performed in 1998 and are subject to change, <br /> <br />Personnel ClassIfication Hourly Rate <br />Principal 5120 . $140 <br />Senior Project Manager $95.$115 <br />Project Manager $80-$110 <br />Senior Engineer $80 - $95 <br />Engineer IV $70 - $90 <br />Engineer III $50 - $70 <br />Engineer II $40 - $60 <br />Engineering Technician $40 - $60 <br />Senior CADD System Specialist $50 - 570 <br />Senior CADD Operator $50 - 570 <br />CADD Operator $40 - $60 <br />Drafter 535 . 550 <br />Senior Designer $50 - $70 <br />Designer III $40 - 560 <br />Designer II 535 - 550 <br />Construction Resident $65 . $80 <br />Word Processing Specialist 535 - $45 <br />Clerk $30 - $35 <br /> <br />Other Direct Project Costs Charge <br />Auto Mileage $O,3151mi <br />Air Travel Actual Cost <br />Travel Meals Actual Cost <br />Printing. BluelinelBlackIine $O,30/sq ft <br />Printing. Mylar Plastic 51,35/sq fl <br />Photo Copying (S-112x11) 50, 1 O/sheet <br />Photo Copying (11x17) $O,20/sheet <br />Printing - Outside Service Actual Cost <br />Telephone Actual Cost <br />Engineering Computer 510,OOlhr <br />CAD Computer 515,OO/hr <br />Other Project Related Expenses Actual Cost <br />
The URL can be used to link to this page
Your browser does not support the video tag.