My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06961
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:28 PM
Creation date
10/5/2006 2:37:11 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Littleton
Stream Name
Massey Draw and SJCD South
Basin
South Platte
Title
Conceptual Design Report for Massey Draw and SJCD (South) Mjor Drainageway Planning Update
Date
2/1/2006
Prepared For
Jefferson County
Prepared By
Olsson Associates
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ Ci()' (if Littleton <br /> <br />.~ <br />~..;y'YiJ..I' ':;-.. <br />~--"- <br />-,-' <br />.. <br /> <br />M.:lssey [lr<"'N 2'na 5JCD ISourh) .\t1aJO' DralnagE'N.;:ry P;annlflg update <br />Conceptui1i ~ Report <br />Feoru..'Il)' 2006 <br /> <br />Table B-1 <br /> <br /> Summa 01 Observations <br /> Discharge Max. Flow Max. Flow Approx. Depth of Incised Street Overtopping Depth <br /> Velocitv De th Channel # Flooded <br />Reach From/To Ownership Average 10- 100- 10- 100- 10- 100- IEstimated Structures Comments <br /> Slope Year Year Year Year Year Year 0-3 ft 3-6 ft 6-9 ft 9-12 ft 5-Year lOO-Year Return during 100- <br /> (ft) (ft) i,erio~\ Year <br /> (cIs) (cfs) (Ips) (Ips) (ft) (ft) Years <br />North.Tributary. ~assey. Draw - - - -- - - .. <br /> - . <br /> ._~--~ _,T ~.,","'~~-- - -~ ----,,---..- -- , - -.--- - T_ <br />1 Confluence to Chatlield 1.8% 499 1181 7,6 9,2 4,3 6,2 X Massey Draw Watershed and <br />Wadsworth State Park Ecosvstem Imorovements site <br /> Wadsworth to Wadsworth 1 House <br />2 Private 1.9% 440 1036 8,7 10_5 4.4 6.4 X 5-10 lOut <br /> Allison 1.2 building <br /> Allison 1 House Carr 81. culvert and downstream <br />3 Allison to Carr Private 1.9% 440 1036 20,3 24,6 3_1 6,2 50-100 lOut concrete channel constructed in <br /> 0,9 build inn 1968 <br /> Carr 81. culvert and downstream <br />4 Carr to Chatfield Private 1.7% 263 681 8_1 10,3 5.4 6,9 X concrete channel constructed in <br /> 1988 <br /> Dudley Dudley <br />5 Chatfield to FP&AD I 1.5% 234 549 6,5 8,1 8,6 9_6 X 0,8 1.6 2 1 House <br />Garrison Private Chatlield Chatlield <br /> 1,1 1.8 <br /> Garrison to Garrison Channel stabilization <br />6 FP&AD 2.2% 168 393 6.2 7,4 2,9 3,9 improvements downstream of Iri <br /> Kipling 0,9 10-25 St. constructed in 2002 <br /> Kipling to Homeowners Kipling <br />7 Continental Association 2,1 87 191 4,7 7,3 3_0 3,6 0.5 25-50 <br /> Divide <br /> <br />0\ <br /> <br />B-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.