<br />~ <br /> <br />Massey Dri;tW ana SJCD (South) Map Dr alnagev..ay Planning Update <br />Conceptual Design Repon <br />February 2006 <br /> <br />Dry 0/ Littleton <br /> <br /> <br />Reaches 6 and 6.1 KiDlina to C-470 and Meadow Ranch Area: Throughout the reach, low flow <br />check structures are proposed to control headcutting. The structures would have a 3-100t maximum <br />drop, with a predicted 0.4% slope between the structures. Acquisition of a drainage easement is <br />recommended. <br /> <br />Reach 3 - Allison to Carr: There are no improvements proposed along this reach. <br /> <br />Although Kipling Street was estimated to overtop up to 0.7 feet during the 1 DO-year storm, the mapping <br />~ndicates that a small portion of Kipling Street would be impacted, likely at a lesser depth. No <br />Improvements are proposed. <br /> <br />Reach 4 - Carr to Chatfield: A 21.4 acre-foot regional detention basin is proposed upstream of Carr <br />Street to reduce the downstream flow from 1036 to 700 cfs. The flow reduction will eliminate the <br />overtopping at Allison Street and will eliminate the flooding of two houses. Two 6-foot high sloping <br />drop structures are proposed downstream of Chatfield Avenue to drop the channel down to the <br />elevation needed to construct the regional detention basin. The channel downstream of Chatfield is <br />proposed to be reshaped with a bottom width of 20 feet, side slopes of 4:1 and a bottom slope of 0.4%. <br />A drainage easement is recommended between Carr Street and Chatfield Avenue. <br /> <br />To prevent the existing flow split and resulting flooding, a levee that conforms to FEMA requirements is <br />proposed to be constructed on the golf course south of the existing driving range detention basin. The <br />levee would direct the 1 OO-year floodwater south of Rockland Drive. A 24-inch reinforced concrete <br />pipe culvert would be constructed through the levee in order to allow low flows to reach existing <br />wetlands east of the proposed levee and north of West Rockland Drive. The owner of the existing <br />Driving Range detention basin would provide full conveyance of the 1 QO-year flow from the detention <br />basin into Massey Draw without the water flowing in an easterly direction north of Rockland Drive. The <br />existing 78.inch diameter reinforced concrete pipe outfall from the detention basin would be extended <br />south through a series of drop manholes to a proposed grass-lined channel that will carry flow south of <br />Rockland Drive to Massey Draw. The channel would have a low-flow channel with a slope of 0.4 <br />percent, bottom with of four feet, depth of two feet, and 2.5:1 (horizontal to vertical) side slopes. The <br />grass-lined channel will have four feet wide overbanks and 4:1 side slopes. A 4.5-foot high drop <br />structure would be constructed in the channel to achieve 0.4 percent slopes. Regrading would lake <br />place between Stations 179+00 and 190+00 along the proposed Massey Draw flow path to maximize <br />the available flow path. A wetland-bottom channel with a bottom width of 100 feet, 2.5:1 side slopes, <br />and a depth of 2 feet would continue east to Kipling Slreet to prevent an increase in water surface <br />elevations due to the additional water flowing south of Rockland Drive. <br /> <br />Reach 5 Chatfield 10 Garrison: Low flow check structures are proposed throughout the reach to <br />control headcutting. The structures would have a 3.foot maximum drop, with a predicted 0.4% slope <br />between the structures. A drainage easement is recommended between Dudley Street and Chatfield <br />Avenue. <br /> <br />Downstream of Garrison, two 7-foot sloping drop structures are proposed to reduce the channel slope <br />and control erosion. The existing culvert under Garrison Street is proposed to be removed and <br />replaced with a 13 foot x 5 foot reinforced concrete box culvert to eliminate the overtopping and the <br />resulting spilling of water inlo the driveway of townhouses on the east side of Garrison Street. <br /> <br />Two 8.foot x 4-foot reinforced concrete box culverts are proposed at Chatfield Avenue to eliminate the <br />street overtopping and at Dudley Street to reduce the overtopping to 0.7 feet. A 6-foot high sloping <br />drop structure is proposed upstream of Dudley Street to drop the channel down to the elevation <br />needed to construct the culvert improvements. The channel downstream of Dudley Street is proposed <br />to be reshaped with a 20-foot bottom width, 4:1 side slopes, and a bottom slope of 0.4%. <br /> <br />Select channel banks within the reach are proposed to be stabilized by regrading the banks and <br />providing vegetative and buried rip rap protection. <br /> <br />Reach 6 - Garrison to KiDlina: Low flow check structures are proposed to control headcutting. The <br />structures would have a 3-foot maximum drop, with a predicted 0.4% slope between the structures. <br /> <br />Reach 7 C-470 to Valley Road: Improvements are proposed to the wall along the north side of the <br />bike path thaI parallels the north side of Massey Draw. The top of the wall would be raised from <br />approximately station 268+80 10 273+60 to prevent flow from spilling onto Ken Caryl Avenue. One foot <br />of freeboard is recommended for the wall. <br /> <br />Reach 7 - KiDlinc to Continental Divide Road: Low flow check structures are proposed to control <br />headcutting, if it becomes a problem. The structures would have a 3-foot maximum drop, with a <br />predicted 0.4% slope between the structures. It is recommended that the Owner of the existing <br />detention basin protect the embankment to prevent failure, if it is not protected. <br /> <br />North Tributary of Massey Draw <br /> <br />SJCD (South) <br /> <br />Reach 1 Confluence to Wadsworth: A 6-foot x 8-foot reinforced concrete box culvert is proposed to <br />be installed parallel 10 the existing structure at Wadsworth. The culvert is intended to eliminate the <br />1 OO-year overtopping at Wadsworth. <br /> <br />Reach 1 South Platte Park to S. Platte Canyon Road: Channel improvements are proposed to <br />convey water from the culverts under South Platte Canyon Road to the PMF channel. A 36-inch <br />reinforced concrete pipe (RCP) culvert was constructed to carry Last Chance ditch flow over the <br />channel. <br /> <br />Reach 2 Wadsworth to Allison: UDFCD is currently designing a rehabilitation project approximately <br />200 feet downstream of Allison Street. The improvements will include a 4-foot high sloping drop <br />structure, boulder lined channel and re-alignment of a portion of the drainageway. <br /> <br />Reach 2 - South Platte Canyon Road to Depew: Three 14-foot x 8-foot reinforced concrete box <br />culverts are proposed to replace the existing culvert at South Platte Canyon Road to eliminate the <br />street overtopping. A 5.5-foot high sloping drop structure is proposed upstream of South Platte <br />Canyon Road to drop the channel down to the elevation needed to construct the culvert improvements. <br /> <br />Additional, low flow check structures and two 5.5-foot high sloping drop structures are proposed to <br />control headcutting. The check structures would have a 3-foot maximum drop, with a predicted 0.4% <br />slope between the structures. Acquisition of a drainage easement is recommended. <br /> <br />Reach 3 - Depew to Kendall: Low flow check structures are proposed to control headcutting. The <br />structures would have a 3-foot maximum drop, with a predicted 0.4% slope between the structures. <br /> <br />0\ <br /> <br />6-5 <br />