My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06925
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06925
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:22 PM
Creation date
10/5/2006 2:36:14 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Community
Greeley
Stream Name
Cache La Poudre River
Basin
South Platte
Title
Master Floodway Planning
Date
3/11/1983
Prepared For
Greeley
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />- - <br /> <br />I. INTRODUCTION <br /> <br /> <br />Simons, Li & Associates, Inc. (SLA) is pleased to submit this proposal <br /> <br /> <br />for engineering services to provide the City of Greeley (City) with a master <br /> <br /> <br />floodway plan. The proposed project consists of performing hydraulic and <br /> <br /> <br />engineering computations for the delineation of the lOO-year floodway, <br /> <br /> <br />formulation of proposed plans of improvement for the study reach, and prepara- <br /> <br /> <br />tion of a study report. All work will be performed to Colorado Water <br /> <br /> <br />Conservation Board (CWCB), Federal Emergency Management Agency (FEMA), and <br /> <br /> <br />City of Greeley standards. <br /> <br />This proposal is prepared following the format specified in the Request <br /> <br /> <br />for Proposal (RFP). The proposal is divided into, sections presenting tech- <br /> <br /> <br />nical approach, experience of the firm, and cost analysis for project services <br /> <br /> <br />with a letter of transmittal. <br /> <br />/ <br />
The URL can be used to link to this page
Your browser does not support the video tag.