Laserfiche WebLink
<br /> <br />'''''''''''''~"'"-'' <br /> <br />6 <br /> <br />After more discussion, the following decisions were made. <br />1. David Walker of ewCB would call a colleague in the USBR to determine the aval1- <br />abl1lty of additional funds. He wlll also explore sharing the additional cost <br /> <br />:50-:50 between the USBR and CWCB. <br /> <br />Z. At the same time, Cmf Pugh will make a more refined estimate of the additional <br /> <br />funds that would be needed. <br /> <br />3. When the first Z steps are completed, the group wi11 meet again either at the <br /> <br />offices of UOFCD or WWE to determine the revised second model configuration of <br /> <br />the downstream embankment, if this Is considered necessary. <br /> <br />4. USBR personnel will continue to test and analyze measurements for the range of <br /> <br />boating flow rates on the model as it is now configured. <br /> <br />Submitted by <br />WRIGHT WATER EIIGIIlEERS. lilt. <br /> <br />~~ <br /> <br /> <br /> <br />Ronald L. Rossmi11er, PhD. PE <br /> <br />Project Manager <br /> <br />Approved <br /> <br />CWCB, UOFCD, City of Sheridan <br />