My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06919
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06919
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:20 PM
Creation date
10/5/2006 2:35:57 AM
Metadata
Fields
Template:
Floodplain Documents
County
Arapahoe
Stream Name
South Platte
Basin
South Platte
Title
Union Avenue Boat Drop
Date
1/1/1983
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Easement
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />AGENDA FOR COMPLETION OF UNION AVENUE BOAT CHUTE STUDY <br /> <br />WORK COMPLETED TO DATE: <br /> <br />1. CONSTRUCTION OF PHYSICAL MODEL. <br /> <br />2. TESTING DIFFERENT STREAMFLOWS TO DEVELOP DESIRED FLOW PATTERNS <br />FOR BOATING. <br /> <br />3. MODIFICATION OF THE UPPER BOAT CHUTE 5 TIMES TO CREATE BETTER <br />BOATING CONDITIONS. <br /> <br />4. MODIFICATION OF THE SECOND BOAT CHUTE 2 TIMES TO CREATE BETTER <br />BOATING CONDITIONS. <br /> <br />5. INITIAL SEDIMENT TRANSPORT AND DEPOSITION IN POOL BETWEEN BOAT <br />CHUTES. <br /> <br />6. CALIBRATION OF THE CITY OF ENGLEWOOD WATER INTAKE I RADIAL GATE I <br />AND WEIR CREST <br /> <br />7. TWO DEMONSTRATIONS OF THE MODEL OPERATING THROUGH A FULL RANGE <br />OF FLOWS. <br /> <br />8. CONDUCTED TESTS TO ESTABLISH RELATIONSHIP BETWEEN SLUICING AND <br />BOATING FOR RANGE OF FLOWS. <br /> <br />9. REDUCED VOLUME OF RIPRAP FOR UPSTREAM DAM AND LOWERED LEFT WALL <br />OF SLUICE. <br /> <br />WORK TO BE COMPLETED TO FINISH STUDY: <br /> <br />1. REPLACE SECOND BOAT CHUTE AND TEST BOATING CONDITIONS FOR A <br />RANGE OF FLOWS. <br /> <br />2. CONDUCT SEDIMENT TRANSPORT AND DEPOSITION TEST FOR A TYPICAL <br />SPRING FLOOD (2000 FT3/S) <br /> <br />3. DETERMINE VELOCITY PATTERNS IN POOL BETWEEN TWO BOAT CHUTES. <br /> <br />4. DETERMINE VELOCITY PATTERNS IN APPROACH TO UNION AVENUE DAM. <br /> <br />5. DISCUSS ADDITIONAL MODIFICATIONS TO THE MODEL TO COMPLETE <br />STUDY. <br />6. COMPLETE REPORT. <br />
The URL can be used to link to this page
Your browser does not support the video tag.