My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06890
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06890
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:14 PM
Creation date
10/5/2006 2:34:47 AM
Metadata
Fields
Template:
Floodplain Documents
County
Rio Blanco
Community
Willow Bend
Stream Name
White River
Basin
Yampa/White
Title
Willow Bend Mobile Home Park Community File
Date
1/1/2001
Prepared For
CWCB
Prepared By
CWCB
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,/ <br />... 4. <br />/ <br />, <br />/ <br />/ <br /> <br />/ <br /> <br />Water Supp. <br /> <br />(a) A general description of <br />its leea1, technical and <br />below: <br /> <br />. <br /> <br />the water supply, as well as <br />natural sufficiency, appears <br /> <br />Q <br />The water supply, as shown by the plot plan. will be <br />from a horizontal well under the river pumped to a <br />storage tank of one hundred (100) feet elevation <br />which will result in approximately fifty (50) P.S.I. <br />over the entire mobile home park. The water will <br />meet all state specifications as to potability and <br />health standards. <br /> <br />/ <br /> <br />(b) More detailed evidence of the water supply's sufficiency <br />is submitted in Attachment G to this Application. <br /> <br />See plot plan. <br /> <br />b. Sewage and Garbage Disposal. <br /> <br />(a) A general description of the methods of sewage and <br />garbage disposal appears below: <br /> <br />The sewage plant will be a package extended ariation <br />plant which meets Colorado health standards. The <br />plant is manufactured by Aerojest and is of 35,000 <br />gallons capacity which is more than sufficient to <br />meet the requirements of a one hundred percent (100%) <br />occupancy rate of the park. <br /> <br />It is anticipated that the garbage disposal will <br />be handled by contract with the then existing <br />contractor who is qualified by the Public utilities <br />Commission and operating in the area of the mobile <br />home park. <br /> <br />...' <br />
The URL can be used to link to this page
Your browser does not support the video tag.