My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06872
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06872
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:12 PM
Creation date
10/5/2006 2:34:28 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Uncompahgre River
Basin
Gunnison
Title
Sediment Transport Investigation for the North Ouray, Uncompahgre River Redevelopment Project
Date
4/5/1995
Prepared For
Ouray
Prepared By
Flo Engineering Inc.
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />LIST OF TABLES <br /> <br />Table 3.1 a - Uncompahgre River tributary peak discharge and <br />runoff event values. water only. <br /> <br />.3.3 <br /> <br />Table 3.1 b - Uncompahgre River tributary peak discharges and <br />runoff event volumes, bulked for debris <br /> <br />.3.3 <br /> <br />Table 3.2 - Flow duration curve estimated for project site based on transfer of <br />USGS record for the Uncompahgre near Ridgway. <br /> <br />35 <br /> <br />Table 3.3 - 2-year and 100-year hydrographs developed for the <br />Uncompahgre River at the project site <br /> <br />.3.7 <br /> <br />Table 4.1 - Cross-sectional geometry p3rameters. <br /> <br />.4.3 <br /> <br />Table 4.2 - Classification of Uncompah!Jfe River based on I"osgen stream types <br /> <br />.4.5 <br /> <br />Table 6.1a - Hydraulic geometry coefficients and exponents, existing condition <br /> <br />.6.9 <br /> <br />Table 6.1 b - Hydraulic geometry coefficients and exponents. <br />proposed project condition . <br /> <br />.6.9 <br /> <br />Table 6.2a - Critical diameters for existi1g conditions, Uncompahgre River. <br /> <br />6.10 <br /> <br />Table 6.2b - Critical diameters for proposed project condition, Uncompahgre River <br /> <br />6.10 <br /> <br />Table 6.3 - Selected bed material sized for proposed project conditions <br /> <br />6.12 <br /> <br />Table 6.4 - Average annual bed load vcnsport <br /> <br />6.12 <br /> <br />Table 6.5 - Formative discharges <br /> <br />6.14 <br /> <br />Table 6.6 - Two and 1 OO-year snowmelt runoff event sediment transport. <br /> <br />6.14 <br /> <br />LIST OF FIGURES <br /> <br />Figure 2.1 - Project Location Map. <br /> <br />.2.2 <br /> <br />Figure 5.1 a - Typical riffle cross section geometry <br /> <br />.5.2 <br /> <br />Figure 5.1 b - Typical pool cross section geometry. <br /> <br />.5.2 <br /> <br />Figure 6.1 a - Subsurface and bar bed material sieve analysis <br /> <br />.6.2 <br /> <br />Figure 6.1 b - Surface bed material samples, Wolman Cou nt <br /> <br />.63 <br /> <br />Figure A 1 - Water surface and thalweg profiles (2- and 100-year peaks). <br /> <br />.A-1 <br /> <br />Figure A2a - Effective top width vs. river station (2-year peak) . <br /> <br />.A-2 <br /> <br />Figure A2b - Effective top width vs river station (100-year peak) <br /> <br />.A-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.