<br />Seal around Pier:
<br />Research conducted by the FHWA has indicated that the space between the pier and the
<br />cable-tied concrete blocks must be filled or scour may occur under the blocks. To provide
<br />this seal, MnDOT proposed that concrete be placed around the pier. MnDOT suggested
<br />that the river bed could be excavated around the piers to the top of the footing. The mat
<br />could be put directly on top of the footing and next to the pier with concrete placed
<br />underneath, on top of, or both, to provide a seal between mat and pier.
<br />
<br />The State of Maine Department of Transportation (MOOT) has designed an articulated block
<br />system for a pier at Tukey's Bridge over Back Cove. MOOT recommended a design in
<br />which grout bags were placed on top of the mat at the pier location to provide the necessary
<br />seal (see Figure 4.7).
<br />
<br />~ PliIt' Ho.2
<br />I
<br />
<br />J4.'-U'
<br />
<br />
<br />34'-0-
<br />
<br />Ciflf'lbunan Sob
<br />
<br />~ fir'OIIt tubet at .'-0" C.C.
<br />that._I...dto~"kMof
<br />M<L ,.,.o-oid. liftOft... ~ ta-
<br />!ftCll'lltor!lt'C'ft fill (It 4'-0- o..e.
<br />~_ IongW tLlb...
<br />
<br />,
<br />I
<br />I
<br />PIoe. Q-out 101.10
<br />fonn 8uIlcit.od tftIrt to
<br />~of..(f",)
<br />
<br />....
<br />
<br />
<br />,.... ('wI
<br />ro 4'-r/' o,c.
<br />(t.l1n. 2: pM Sot)
<br />lo~
<br />.'
<br />
<br />"'CCltt~Mot
<br />"." ('t)f) I
<br />
<br />......
<br />
<br />,'--cf
<br />
<br />I
<br />2'-4).[
<br />(lofjnJ:
<br />
<br />,
<br />
<br />2'-ti' o-tap at o.a~
<br />Btl..- od**,t _t, crw.l
<br />MaW hmp grwt: lllto MCtl ... ..... __
<br />.....~ at nIOf\ltIJl' tuM. ao. w'-
<br />onCl ~M\ opwDtfoft ot nKl ""'t't\IM
<br />l,tnUQtIltolt~fII'",*,"or"
<br />..... ....
<br />
<br />F1l
<br />
<br />Figure 4.7 Design plans of cable-tied precast block mat for Tukey's Bridge, ME
<br />(MOOT)
<br />
<br />References
<br />
<br />Brown, SA, E.S. Clyde, 1989, "Design of Riprap Revetment," Hydraulic Engineering
<br />Circular No. 11, FHWA-IP-016, prepared lor FHWA, Washington, D.C.
<br />
<br />Clopper, P.E., 1992, "Protecting Embankment Dams with Concrete Block Systems," Hydro
<br />Review, Vol. X, No.2, April.
<br />
<br />Clopper, P.E., 1989, "Hydraulic Stability of Articulated Concrete Block Revetment Systems
<br />During Overtopping Flow," FHWA-RD-89-199, Office of Engineering and Highway
<br />Operations R&D, McLean VA.
<br />
<br />Clopper, P.E., V. Chen, 1988, "Minimizing Embankment Damage During Overtopping Flow,"
<br />FHWA-RD-88-181, Office of Engineering and Highway Operations R&D, McLean VA.
<br />
<br />4.15