Laserfiche WebLink
<br />Seal around Pier: <br />Research conducted by the FHWA has indicated that the space between the pier and the <br />cable-tied concrete blocks must be filled or scour may occur under the blocks. To provide <br />this seal, MnDOT proposed that concrete be placed around the pier. MnDOT suggested <br />that the river bed could be excavated around the piers to the top of the footing. The mat <br />could be put directly on top of the footing and next to the pier with concrete placed <br />underneath, on top of, or both, to provide a seal between mat and pier. <br /> <br />The State of Maine Department of Transportation (MOOT) has designed an articulated block <br />system for a pier at Tukey's Bridge over Back Cove. MOOT recommended a design in <br />which grout bags were placed on top of the mat at the pier location to provide the necessary <br />seal (see Figure 4.7). <br /> <br />~ PliIt' Ho.2 <br />I <br /> <br />J4.'-U' <br /> <br /> <br />34'-0- <br /> <br />Ciflf'lbunan Sob <br /> <br />~ fir'OIIt tubet at .'-0" C.C. <br />that._I...dto~"kMof <br />M<L ,.,.o-oid. liftOft... ~ ta- <br />!ftCll'lltor!lt'C'ft fill (It 4'-0- o..e. <br />~_ IongW tLlb... <br /> <br />, <br />I <br />I <br />PIoe. Q-out 101.10 <br />fonn 8uIlcit.od tftIrt to <br />~of..(f",) <br /> <br />.... <br /> <br /> <br />,.... ('wI <br />ro 4'-r/' o,c. <br />(t.l1n. 2: pM Sot) <br />lo~ <br />.' <br /> <br />"'CCltt~Mot <br />"." ('t)f) I <br /> <br />...... <br /> <br />,'--cf <br /> <br />I <br />2'-4).[ <br />(lofjnJ: <br /> <br />, <br /> <br />2'-ti' o-tap at o.a~ <br />Btl..- od**,t _t, crw.l <br />MaW hmp grwt: lllto MCtl ... ..... __ <br />.....~ at nIOf\ltIJl' tuM. ao. w'- <br />onCl ~M\ opwDtfoft ot nKl ""'t't\IM <br />l,tnUQtIltolt~fII'",*,"or" <br />..... .... <br /> <br />F1l <br /> <br />Figure 4.7 Design plans of cable-tied precast block mat for Tukey's Bridge, ME <br />(MOOT) <br /> <br />References <br /> <br />Brown, SA, E.S. Clyde, 1989, "Design of Riprap Revetment," Hydraulic Engineering <br />Circular No. 11, FHWA-IP-016, prepared lor FHWA, Washington, D.C. <br /> <br />Clopper, P.E., 1992, "Protecting Embankment Dams with Concrete Block Systems," Hydro <br />Review, Vol. X, No.2, April. <br /> <br />Clopper, P.E., 1989, "Hydraulic Stability of Articulated Concrete Block Revetment Systems <br />During Overtopping Flow," FHWA-RD-89-199, Office of Engineering and Highway <br />Operations R&D, McLean VA. <br /> <br />Clopper, P.E., V. Chen, 1988, "Minimizing Embankment Damage During Overtopping Flow," <br />FHWA-RD-88-181, Office of Engineering and Highway Operations R&D, McLean VA. <br /> <br />4.15 <br />