Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Rio Grande River in a southerly direction. Detailed mapping of this <br />part of Basin VI is not available. <br /> <br />H. BASIN VII <br /> <br />Basin VII is in the south-central portion of the study area, extend- <br />ing south beyond the airport. It is bounded by U.S. 285 on the west, <br />Wests ide irrigation ditch on the east, and the Hickory-Jackson ditch <br />on the north. <br /> <br />The total drainage of Basin VII is approximately 3.5 square miles, <br />most of which is undeveloped. Some scattered residential and commer- <br />cial sites do exist, although the predominate feature is the airport <br />with a parking area, taxiways, and runways. <br /> <br />Basin VII has no major drainage pattern because it is composed of <br />smaller sub-basins that either do not drain or tend to drain to the <br />south and southeast. The Westside ditch interrupts the sub-basin <br />drainage pattern; but due to the lack of development, localized pond- <br />ing areas are not noticed. Where development has occurred in low <br />areas, ponding does exist. The area between 17th and 20th Streets <br />(east of State Avenue) has also experienced localized ponding. Waters <br />are trapped by the elevated airport runways; but since there is no <br />large concentration of flow, no threat exists that the runway would <br />be inundated by stormwater runoff. <br /> <br />I. BASIN VIII <br /> <br />Basin VIII is located in the north-central portion of the study area. <br />It is bounded on the south and west by the river, on the north by <br />Sixmile Road, and on the east by State Highway 17. <br /> <br />The total drainage of Basin VIII is approximately 0.9 square miles, <br />most of which is undeveloped. The basin includes a golf course. A <br /> <br />-21- <br />