Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />t <br />I <br />I <br />I <br /> <br />TABLE OF CONTENTS <br /> <br />PREFACE <br /> <br />INTRODUCTION <br />Authorization <br />Purpose and Scope <br />Acknowledgments <br />Mapping and Surveys <br /> <br />STUDY AREA DESCRIPTION <br />Drainage Basin Characteristics <br />Flooding Potential <br />Drainage Structure Inventory <br /> <br />SPECIAL STUDIES <br />Flood Hydrology <br />Hydraulics, Flood Plain and Floodway Delineation <br />Damage-Benefit Potential <br />Legal Evaluation <br />Soils Investigation <br /> <br />INTERIM PLANNING <br />Proposed Drainageway Improvement Alternatives <br />Interim Planning and Decision Making <br /> <br />FINAL PLANNING CRITERIA <br />Drainageway Design Criteria <br />Channels <br />Culverts and Bridges <br />Operations and Maintenance Considerations <br />Irrigation Ditch Crossings <br />Flood Storage Reservoirs <br /> <br />DRAINAGEWAY IMPROVEMENTS <br /> <br />COSTS <br /> <br />PLAN IMPLEMENTATION <br /> <br />SUMMARY <br /> <br />BIBLIOGRAPHY <br /> <br />APPENDIX <br /> <br />DRAWINGS <br /> <br />Page <br /> <br />1 <br /> <br />1 <br />1 <br />1 <br />2 <br />2 <br /> <br />3 <br />3 <br />4 <br />4 <br /> <br />5 <br />5 <br />6 <br />7 <br />8 <br />9 <br /> <br />9 <br />10 <br />13 <br /> <br />14 <br />14 <br />14 <br />14 <br />15 <br />16 <br />16 <br /> <br />16 <br /> <br />22 <br /> <br />24 <br /> <br />25 <br /> <br />26 <br /> <br />Figure 5 <br /> <br />Table I <br />Table II <br />Table III <br />Table IV <br /> <br />Table V <br />Table VI <br /> <br />Table VII <br />Table VIII <br />Table IX <br /> <br />Figure 1 <br /> <br />Figure 2 <br /> <br />Figure 3 <br /> <br />Figure 4 <br /> <br />Figure 6 <br /> <br />LIST OF TABLES <br /> <br />Page <br /> <br />Structure Inventory <br /> <br />Design Rainfall and Abstractions <br /> <br />Flood Frequency and Discharge <br /> <br />Unit Prices Used for Estimated <br />Construction Costs <br /> <br />Cost Breakdown <br /> <br />Plan Implementation Priority <br />Recommendations <br /> <br />Van Bibber Creek, Land Use Data <br /> <br />Basin Paramenters <br /> <br />Flood Plain and Floodway Reference Data <br /> <br />5 <br />6 <br />6 <br /> <br />23 <br />23 <br /> <br />24 <br />A-4 <br /> <br />A-5 <br /> <br />A-6 <br /> <br />LIST OF FIGURES <br />(All Figures Located in the Appendix) <br /> <br />10-year, lOa-year flood hydrographs, <br />Van Bibber Creek at Mouth. <br /> <br />10-year, lOa-year flood hydrographs, <br />North Tributary at Mouth. <br /> <br />10-year, 100-year flood hydrographs, <br />South Tributary at Mouth. <br /> <br />la-year, 100-year flood hydrographs, <br />Van Bibber Creek, Upstream Limit of <br />Study. <br /> <br />Discharge Probability Curves, <br />Projected - Developmen~Van Bibber <br />Creek. <br /> <br />Discharge Probability Curves, <br />Projected - Development, South <br />Tributary. <br /> <br />A-I <br /> <br />A-I <br /> <br />A-2 <br /> <br />A- 2 <br /> <br />A- 3 <br /> <br />A- 4 <br />