My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD06827
CWCB
>
Floodplain Documents
>
Backfile
>
6001-7000
>
FLOOD06827
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:10:05 PM
Creation date
10/5/2006 2:32:25 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Basin
South Platte
Title
Pawnee Creek Overflow Interceptor Channel
Date
10/1/2001
Prepared For
Sterling
Prepared By
ICON Engineering, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
328
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2. DRAWING CHECKLIST <br /> <br />Attach plans of the structurels) certified by a registered professional engineer. The plan detail and information should include <br />the following (check the boxes if the information has been provided): <br /> <br />I:8J Dimensions (height, width, span, radius, length) <br />I:8J Shape (culverts only) <br />I:8J Material <br />I:8J Beveling or Rounding <br />I:8J Wing Wall Angle <br />[8J Low Chord Elevations. Upstream and Downstream <br />t8J Top of Road Elevations - Upstream and Downstream <br />rg) Structure Invert Elevations - Upstream and Downstream <br />[8J Stream Invert Elevations - Upstream and Downstream <br />I:8J Skew Angle <br />[8J Cross-Section Locations <br />[8J Distances Between Cross Sections <br />[gJ Erosion Protection <br /> <br />3. SEDIMENT TRANSPORT CONSIDERATIONS <br /> <br />If there is any indication from historical records that sediment transport (including scour and deposition) can affect the 100- <br />year (base floodl water~surface elevations; and/or based on the stream geomorphology, vegetative cover, development of the <br />watershed and bank conditions, there is a potential for debris and sediment transport (including sewer and deposition) to <br />affect the base flood elevations, then provide the following information (Check the box if provided): <br /> <br />D Estimated sediment load <br />o Method used to estimate sediment transport <br />o Method used to estimate scour and/or deposition <br />o Method used to revise hydraulic or hydrologic analysis (model) to account for sediment transport <br /> <br />. <br /> <br />FEMA Form 81-89F <br /> <br />Bridge/Culvert Form <br /> <br />MT -2 Form 7 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.